Response from F. Lawerence Oaks to Garry Atkins, Project Review for 65 Percent Construction Document Submittal for Proposed Rehabilitation of Building 2270 Theater 1, Fort Sam Houston, Texas

Author(s): F. Lawrence Oaks

Year: 2005

Summary

The Texas Historical Commission received correspondence from Fort Sam Houston describing the proposed rehabilitation of Building 2270 Theater 1. After review, the Commission has determined that the project will have no adverse effect on the historic theater.

Copied to this correspondence is Michael Pumphrey, Historical Architect, Fort Sam Houston.

Cite this Record

Response from F. Lawerence Oaks to Garry Atkins, Project Review for 65 Percent Construction Document Submittal for Proposed Rehabilitation of Building 2270 Theater 1, Fort Sam Houston, Texas. F. Lawrence Oaks. 2005 ( tDAR id: 435956) ; doi:10.48512/XCV8435956

Spatial Coverage

min long: -98.469; min lat: 29.449 ; max long: -98.405; max lat: 29.484 ;

Individual & Institutional Roles

Contact(s): Cultural Resource Office, Joint Base San Antonio

Repository(s): Fort Sam Houston

Prepared By(s): Texas Historical Commission

Submitted To(s): Department of the Army, Fort Sam Houston

File Information

  Name Size Creation Date Date Uploaded Access
20050427-To-FSH-SHPO-Bldg-2270-Rehab.pdf 123.20kb May 23, 2017 1:22:24 AM Confidential

Accessing Restricted Files

At least one of the files for this resource is restricted from public view. For more information regarding access to these files, please reference the contact information below

Contact(s): Cultural Resource Office, Joint Base San Antonio