Response from F. Lawerence Oaks to Garry Atkins, Project Review for Proposed Demolition of Building 330 Due to PCE Contamination, Fort Sam Houston, Texas
Author(s): F. Lawrence Oaks
Year: 2005
Summary
The Texas Historical Commission has received correspondence from Fort Sam Houston describing the proposed demolition of Building 330 Due to PCE Contamination. After review of the documentation provided, the Commission has determined that the subject undertaking will require an amendment to the Memorandum of Agreement (MOA). This letter serves as comment on the proposed undertaking from the State Historic Preservation Officer, the Executive Director of the Texas Historical Commission.
Cite this Record
Response from F. Lawerence Oaks to Garry Atkins, Project Review for Proposed Demolition of Building 330 Due to PCE Contamination, Fort Sam Houston, Texas. F. Lawrence Oaks. 2005 ( tDAR id: 435957) ; doi:10.48512/XCV8435957
Keywords
Culture
Historic
Site Type
Governmental Structure
Investigation Types
Architectural Documentation
•
Heritage Management
General
Building 330
•
PCE Contamination
Geographic Keywords
Bexar (County)
•
JBSA-Sam Houston
•
San Antonio
•
Texas
Spatial Coverage
min long: -98.463; min lat: 29.448 ; max long: -98.409; max lat: 29.483 ;
Individual & Institutional Roles
Contact(s): Cultural Resource Office, Joint Base San Antonio
Repository(s): Fort Sam Houston
Prepared By(s): Texas Historical Commission
Submitted To(s): Fort Sam Houston
File Information
Name | Size | Creation Date | Date Uploaded | Access | |
---|---|---|---|---|---|
20050607-To-FSH-SHPO-Bldg-330-Demo.pdf | 76.54kb | May 23, 2017 2:07:20 AM | Confidential |
Accessing Restricted Files
At least one of the files for this resource is restricted from public view. For more information regarding access to these files, please reference the contact information below
Contact(s): Cultural Resource Office, Joint Base San Antonio