Response from F. Lawerence Oaks to Garry Atkins, Project Review for Proposed Demolition of Building 330 Due to PCE Contamination, Fort Sam Houston, Texas

Author(s): F. Lawrence Oaks

Year: 2005

Summary

The Texas Historical Commission has received correspondence from Fort Sam Houston describing the proposed demolition of Building 330, due to PCE contamination. This letter serves a comment on the proposed undertaking and includes the signed amendment to the Memorandum associated with this undertaking.

Copied to this correspondence is the Society for the Preservation of Historic Fort Sam Houston, San Antonio Conservation Society, and the City of San Antonio Historic Preservation Office.

Cite this Record

Response from F. Lawerence Oaks to Garry Atkins, Project Review for Proposed Demolition of Building 330 Due to PCE Contamination, Fort Sam Houston, Texas. F. Lawrence Oaks. 2005 ( tDAR id: 435960) ; doi:10.48512/XCV8435960

Spatial Coverage

min long: -98.466; min lat: 29.45 ; max long: -98.404; max lat: 29.48 ;

Individual & Institutional Roles

Contact(s): Cultural Resource Office, Joint Base San Antonio

Repository(s): Fort Sam Houston

Prepared By(s): Texas Historical Commission

Submitted To(s): Fort Sam Houston

File Information

  Name Size Creation Date Date Uploaded Access
20050725-To-FSH-SHPO-Bldg-330-Demo.pdf 2.00mb May 23, 2017 7:24:50 AM Confidential

Accessing Restricted Files

At least one of the files for this resource is restricted from public view. For more information regarding access to these files, please reference the contact information below

Contact(s): Cultural Resource Office, Joint Base San Antonio