Response from Stanley Graves, James Steely, and James E Bruseth to John Brenneman, Draft CRMP Changes, Army N2, N10, D2, D10, DAP, Fort Sam Houston, Texas
Author(s): Stanley O. Graves; James W. Steely; James E. Bruseth
Year: 1994
Summary
After review, the Texas Historical Commission has offered this list of corrections and comments for the Cultural Resource Management Plan created for Army N2, N10, D2, D10, and DAP.
Cite this Record
Response from Stanley Graves, James Steely, and James E Bruseth to John Brenneman, Draft CRMP Changes, Army N2, N10, D2, D10, DAP, Fort Sam Houston, Texas. Stanley O. Graves, James W. Steely, James E. Bruseth. 1994 ( tDAR id: 440469) ; doi:10.48512/XCV8440469
Keywords
Investigation Types
Architectural Documentation
•
Heritage Management
Geographic Keywords
Bexar (County)
•
JBSA-Sam Houston
•
San Antonio
•
Texas
Spatial Coverage
min long: -98.456; min lat: 29.451 ; max long: -98.417; max lat: 29.477 ;
Individual & Institutional Roles
Contact(s): Cultural Resource Office, Joint Base San Antonio
Repository(s): Fort Sam Houston
Prepared By(s): Texas Historical Commission
Submitted To(s): Environmental and Natural Resources Branch, Fort Sam Houston
File Information
Name | Size | Creation Date | Date Uploaded | Access | |
---|---|---|---|---|---|
19940202-To-FWCE-SHPO-CB-CRMP_Letter-2.pdf | 1.20mb | Jan 10, 2018 7:20:48 AM | Confidential |
Accessing Restricted Files
At least one of the files for this resource is restricted from public view. For more information regarding access to these files, please reference the contact information below
Contact(s): Cultural Resource Office, Joint Base San Antonio