Letter from Tetra Tech Inc. to the US Army Laboratory Center, Phase II Work Plan

Part of the Blossom Point Project Page (DRAFT) project

Author(s): Paula Bienenfeld Ph.D.

Year: 2000

Summary

A letter from Tetra Tech Inc. to the US Army Research Laboratory in regards to the Phase II Archaeological work plan at the Blossom Point Test Facility. Included is a sticky note label for Blossom Point and site number.

Cite this Record

Letter from Tetra Tech Inc. to the US Army Laboratory Center, Phase II Work Plan. Paula Bienenfeld Ph.D.. 2000 ( tDAR id: 445866) ; doi:10.6067/XCV8445866

Spatial Coverage

min long: -79.514; min lat: 38.281 ; max long: -76.838; max lat: 39.749 ;

File Information

  Name Size Creation Date Date Uploaded Access
BPI_0544_CorrespondenceBienfeldtoCraig_2000_OCR_PDFA.pdf 550.78kb May 17, 2018 4:51:16 PM Confidential

Accessing Restricted Files

At least one of the files for this resource is restricted from public view. For more information regarding access to these files, please reference the contact information below

Contact(s): US Army Corps of Engineers Mandatory Center of Expertise for the Curation and Management of Archaeological Collections, St. Louis District