Addendum Corridor Study NRO Substation at Cape Canaveral, Brevard County, Florida
Summary
On November 9, 2006, New South Associates (NSA) conducted an intensive cultural resource assessment survey of an approximately 205-meter long by 30-meter wide proposed FP&L powerline corridor on Cape Canaveral Air Force Station (CCAAFS) between the Banana River and the Atlantic Ocean in Brevard County, Florida. The archaeological survey was performed at the request of SRS Technologies (SRS) on behalf of CCAFS. The new corridor will serve to connect the 3-acre substation parcel with the existing Florida Power & Light (FP&L) corridor, both previously surveyed by NSA with negative results (Smith 2006). This document is meant to serve as an Addendum to the previous report on the adjacent property. To summarize results, all testing along the added corridor was negative and no further work was recommended.
Cite this Record
Addendum Corridor Study NRO Substation at Cape Canaveral, Brevard County, Florida. Greg C. Smith. 2006 ( tDAR id: 458132) ; doi:10.48512/XCV8458132
Keywords
Site Name
8BR00085
Investigation Types
Historic Background Research
•
Methodology, Theory, or Synthesis
•
Systematic Survey
General
Cape Canaveral Air Force Station
Geographic Keywords
Brevard (County)
•
Cape Canaveral
•
Florida (State / Territory)
Spatial Coverage
min long: -80.89; min lat: 28.207 ; max long: -80.5; max lat: 28.743 ;
Individual & Institutional Roles
Contact(s): Cape Canaveral Space Force Station CRM Manager
Record Identifiers
DHR Project File Number(s): 2006-6456
FMSF Survey #(s): 13925
File Information
Name | Size | Creation Date | Date Uploaded | Access | |
---|---|---|---|---|---|
13925.pdf | 712.62kb | Sep 24, 2020 8:31:36 AM | Confidential |
Accessing Restricted Files
At least one of the files for this resource is restricted from public view. For more information regarding access to these files, please reference the contact information below
Contact(s): Cape Canaveral Space Force Station CRM Manager