SHPO: Case Study for the Demolition of Facility 4120-Transformer Building (8BR2252), Launch Complex 1/2, Cape Canaveral Air Force Station

Author(s): Thomas Penders

Year: 2014

Summary

The 45th Space Wing (45 SW) of the United States Air Force (USAF) proposed to demolish Facility 4120-Transformer Building (8BR2252) at Launch Complex 1/2. The Florida SHPO concurred that the undertaking would be an adverse effect and requested a case study be prepared to demonstrate that all possible alternatives were addressed prior to the decision to demolish the properties. This case study has been prepared per the request of the Florida SHPO.

Cite this Record

SHPO: Case Study for the Demolition of Facility 4120-Transformer Building (8BR2252), Launch Complex 1/2, Cape Canaveral Air Force Station. Thomas Penders. 2014 ( tDAR id: 458328) ; doi:10.48512/XCV8458328

Spatial Coverage

min long: -80.89; min lat: 28.207 ; max long: -80.5; max lat: 28.743 ;

Individual & Institutional Roles

Contact(s): Cape Canaveral Space Force Station CRM Manager

File Information

  Name Size Creation Date Date Uploaded Access
Case-Study-Fac-2842--CCAFS.pdf 1.22mb Oct 21, 2020 9:45:12 AM Confidential

Accessing Restricted Files

At least one of the files for this resource is restricted from public view. For more information regarding access to these files, please reference the contact information below

Contact(s): Cape Canaveral Space Force Station CRM Manager