Phase II Environmental Baseline Survey Declaration of Excess Property Bellows Air Force Station Oahu, Hawaii

Author(s): U.S. Army Engineer District

Year: 2005

Summary

The objective of this document is to correct and update the 2001 EBS so that it can be certified. In 1996 the U.S. Air Force conducted an Environmental Baseline Survey (EBS) on an approximately 170-acre parcel at Bellows Air Force Station (BAFS) that they declared excess. The purpose of that survey was to define and document the presence, nature, and extent of hazardous substances that may require remedial action to protect human health or the environment in accordance with Air Force Instruction (AFI) 32-7066. This document discusses cultural resources within the project area.

Cite this Record

Phase II Environmental Baseline Survey Declaration of Excess Property Bellows Air Force Station Oahu, Hawaii. U.S. Army Engineer District. 2005 ( tDAR id: 458903) ; doi:10.48512/XCV8458903

Spatial Coverage

min long: -158.335; min lat: 21.208 ; max long: -157.597; max lat: 21.762 ;

Individual & Institutional Roles

Contact(s): Bellows Air Force Station

Prepared By(s): U.S. Army Engineer District

Submitted To(s): U.S. Air Force

File Information

  Name Size Creation Date Date Uploaded Access
157_US-Army-Engineer_2005.pdf 30.44mb May 1, 2005 Mar 12, 2021 2:45:48 PM Confidential

Accessing Restricted Files

At least one of the files for this resource is restricted from public view. For more information regarding access to these files, please reference the contact information below

Contact(s): Bellows Air Force Station