Letter: Demolition of Building 503

Author(s): Gilbert Coloma-Agaran

Year: 2002

Summary

This project proposes the demolition of Building 503. The removal of the cement slab foundation may require some ground disturbance (between 6 to 12 inches in depth).

Cite this Record

Letter: Demolition of Building 503. Gilbert Coloma-Agaran. 2002 ( tDAR id: 458979) ; doi:10.48512/XCV8458979

Keywords

Site Name
Building 503

Spatial Coverage

min long: -158.319; min lat: 21.21 ; max long: -157.585; max lat: 21.717 ;

Individual & Institutional Roles

Contact(s): Bellows Air Force Station

File Information

  Name Size Creation Date Date Uploaded Access
327_SHPO_Demolition-Building-503.pdf 3.09mb Mar 14, 2021 12:17:42 PM Confidential

Accessing Restricted Files

At least one of the files for this resource is restricted from public view. For more information regarding access to these files, please reference the contact information below

Contact(s): Bellows Air Force Station