LET-541: SYBCI Transmittal Letter for the San Antonio Creek Restoration Project

Author(s): Christopher Ryan

Year: 2018

Summary

This document is a Section 106 Santa Ynez Band of Chumash Indians (SYBCI) Transmittal Letter for the San Antonio Creek Restoration Project. The project proposed willow pole planting and container planting of riparian plants within a 12-acre field along the south side of San Antonio Creek as mitigation in support of the San Antonio Road West Bridge Maintenance Project. This letter is the initiation of Vandenberg Air Force Base for consultation with the SYBCI on finding no cultural resources identified in the project area.

Cite this Record

LET-541: SYBCI Transmittal Letter for the San Antonio Creek Restoration Project. Christopher Ryan. 2018 ( tDAR id: 467830) ; doi:10.48512/XCV8467830

This Resource is Part of the Following Collections

Individual & Institutional Roles

Contact(s): Vandenberg Space Force Base (VSFB)

Record Identifiers

VAFB Number(s): LET-541

Project ID (s): 813-15-064

File Information

  Name Size Creation Date Date Uploaded Access
LET-541_SYBCI_TransmittalLetter_SACRestoration.pdf 152.26kb Nov 4, 2021 10:05:01 AM Confidential