LET-541: SYBCI Transmittal Letter for the San Antonio Creek Restoration Project
Author(s): Christopher Ryan
Year: 2018
Summary
This document is a Section 106 Santa Ynez Band of Chumash Indians (SYBCI) Transmittal Letter for the San Antonio Creek Restoration Project. The project proposed willow pole planting and container planting of riparian plants within a 12-acre field along the south side of San Antonio Creek as mitigation in support of the San Antonio Road West Bridge Maintenance Project. This letter is the initiation of Vandenberg Air Force Base for consultation with the SYBCI on finding no cultural resources identified in the project area.
Cite this Record
LET-541: SYBCI Transmittal Letter for the San Antonio Creek Restoration Project. Christopher Ryan. 2018 ( tDAR id: 467830) ; doi:10.48512/XCV8467830
This Resource is Part of the Following Collections
Keywords
Investigation Types
Consultation
General
San Antonio Creek
Individual & Institutional Roles
Contact(s): Vandenberg Space Force Base (VSFB)
Record Identifiers
VAFB Number(s): LET-541
Project ID (s): 813-15-064
File Information
Name | Size | Creation Date | Date Uploaded | Access | |
---|---|---|---|---|---|
LET-541_SYBCI_TransmittalLetter_SACRestoration.pdf | 152.26kb | Nov 4, 2021 10:05:01 AM | Confidential |