Fort Sam Houston, Texas Phase I Cultural Resources Survey Pershing Field
Author(s): MACTEC Engineering and Consulting, Inc.
Year: 2006
Summary
As partial fulfillment of the requirements under NEPA, the current project’s main goal is to prepare a detailed statement, as part of the BRAC-Fort Sam Houston EIS, assessing the impacts of he BRAC-related actions to cultural resources in the project area. Although, the scope of NEPA includes the cultural environment, it does not specify a process by which, impacts to cultural resources are to be assessed.
Cite this Record
Fort Sam Houston, Texas Phase I Cultural Resources Survey Pershing Field. MACTEC Engineering and Consulting, Inc.. 2006 ( tDAR id: 470391) ; doi:10.48512/XCV8470391
Keywords
Site Name
41BX1209
Investigation Types
Historic Background Research
General
Pershing Field
Spatial Coverage
min long: -98.489; min lat: 29.438 ; max long: -98.368; max lat: 29.533 ;
Individual & Institutional Roles
Contact(s): Cultural Resource Office, Joint Base San Antonio
File Information
Name | Size | Creation Date | Date Uploaded | Access | |
---|---|---|---|---|---|
Fort-Sam-Houston_Phase-I.pdf | 17.85mb | Sep 7, 2022 11:27:02 AM | Confidential |
Accessing Restricted Files
At least one of the files for this resource is restricted from public view. For more information regarding access to these files, please reference the contact information below
Contact(s): Cultural Resource Office, Joint Base San Antonio