Letter: Proposed Construction of a resilient and reliable 13.2-kilovolt (kV) power generation plant and associated distribution infrastructure at Buckley Air Force Base (AFB) Arapahoe County, Colorado

Part of the Buckley SFB Project Metadata project

Author(s): Steve Turner

Year: 2020

Summary

Letter from Steve Turner, AIA, State Historic Preservation Officer History Colorado, to the Installation Management Flight Chief, 460th Civil Engineer Squadron, Buckley Air Force Base, regarding Proposed Construction of a resilient and reliable 13.2-kilovolt (kV) power generation plant and associated distribution infrastructure at Buckley Air Force Base (AFB) Arapahoe County, Colorado. Turner advised that the project would not impact historical/cultural resources.

Cite this Record

Letter: Proposed Construction of a resilient and reliable 13.2-kilovolt (kV) power generation plant and associated distribution infrastructure at Buckley Air Force Base (AFB) Arapahoe County, Colorado. Steve Turner. 2020 ( tDAR id: 470919) ; doi:10.48512/XCV8470919

Spatial Coverage

min long: -104.796; min lat: 39.674 ; max long: -104.716; max lat: 39.733 ;

Individual & Institutional Roles

Contact(s): Buckley Space Force Base CRM Manager

Record Identifiers

History Colorado No.(s): HC#78309

File Information

  Name Size Creation Date Date Uploaded Access
78309_2020-08-27_OAHP_letter.pdf 124.29kb Oct 11, 2022 1:08:51 PM Confidential

Accessing Restricted Files

At least one of the files for this resource is restricted from public view. For more information regarding access to these files, please reference the contact information below

Contact(s): Buckley Space Force Base CRM Manager