Archaeological Survey of Boles Wells Water System Annex Prather Pipeline along Hamilton Road, Alamogordo, Otero County, New Mexico

Part of the Holloman Air Force Base Resources project

Year: 2005

Summary

A Phase I archaeological survey on 3.81 miles of right of way along Hamilton Road in Alamogordo, New Mexico for replacement of an underground pipeline. This survey was conducted on behalf of Holloman Air Force Base (AFB), which is proposing to replace and upgrade the existing underground pipeline servicing Boles Wells. Boles Wells field is detached property belonging to Holloman AFB. While several lithic and ceramic isolated finds were observed, the survey indicated that the project area is too disturbed from recent development, road construction and pipeline placement to yield any artifacts or sites with potential to contribute significant information on local or regional research issues.

Cite this Record

Archaeological Survey of Boles Wells Water System Annex Prather Pipeline along Hamilton Road, Alamogordo, Otero County, New Mexico. 2005 ( tDAR id: 489021) ; doi:10.48512/XCV8489021

Individual & Institutional Roles

Contact(s): Holloman Air Force Base CR Manager

File Information

  Name Size Creation Date Date Uploaded Access
2005_Boles-Wells-Water-System-Annex-Prather-Pipeline.pdf 14.38mb Oct 4, 2023 3:15:46 PM Confidential

Accessing Restricted Files

At least one of the files for this resource is restricted from public view. For more information regarding access to these files, please reference the contact information below

Contact(s): Holloman Air Force Base CR Manager