Environmental Baseline Survey, Power Purchase Agreement for Six (6) Mile Transmission/Communication Line from El Paso Electric Substation to Atlas Substation, Holloman Air Force Base, Otero County New Mexico, Appendix B

Part of the Holloman Air Force Base Resources project

Year: 2016

Summary

Appendix B - Site maps aerial maps topographic maps soil maps.

Cite this Record

Environmental Baseline Survey, Power Purchase Agreement for Six (6) Mile Transmission/Communication Line from El Paso Electric Substation to Atlas Substation, Holloman Air Force Base, Otero County New Mexico, Appendix B. 2016 ( tDAR id: 489034) ; doi:10.48512/XCV8489034

Individual & Institutional Roles

Contact(s): Holloman Air Force Base CR Manager

File Information

  Name Size Creation Date Date Uploaded Access
2017_Environmental-Baseline-Survey-6-Mile-Transmission-Line.pdf 29.06mb Oct 4, 2023 3:18:16 PM Confidential

Accessing Restricted Files

At least one of the files for this resource is restricted from public view. For more information regarding access to these files, please reference the contact information below

Contact(s): Holloman Air Force Base CR Manager