VAFB-2002-07: Final Report: Presence / Absence Testing and Boundary Delineation at Site CA-SBA-707
Author(s): Howard Higgins; Greig Parker; Ivan H. Strudwick; Jim Railey
Year: 2002
Summary
This document presents the results of absence/presence testing at CA-SBA-707 for the Level 3 fiber-optic project.
Cite this Record
VAFB-2002-07: Final Report: Presence / Absence Testing and Boundary Delineation at Site CA-SBA-707. Howard Higgins, Greig Parker, Ivan H. Strudwick, Jim Railey. 2002 ( tDAR id: 490875) ; doi:10.48512/XCV8490875
This Resource is Part of the Following Collections
Individual & Institutional Roles
Contact(s): Corinne Holloway
Record Identifiers
VAFB Document Number(s): VAFB-2002-07
File Information
Name | Size | Creation Date | Date Uploaded | Access | |
---|---|---|---|---|---|
VAFB-2002-07_PresenceAbsenceTesting_BoundaryDelineation_CA-SBA... | 10.17mb | Jan 2, 2024 1:49:16 PM | Confidential |
Accessing Restricted Files
At least one of the files for this resource is restricted from public view. For more information regarding access to these files, please reference the contact information below
Contact(s): Corinne Holloway