VAFBM-2022-02: Archaeological Monitoring Report for the Narlon Bridge Replacement Project (2019-UPRRN)

Year: 2022

Summary

This document is an archaeological monitoring report for the Narlon Bridge Replacement Project. The report covers a period of time approximately 14 months in duration. Applied Earthworks, on behalf of Althouse & Meade, Inc, monitored ground-disturbing activities associated with the project including access road grading, construction of a laydown yard, construction of a bridge that spanned the creek, construction of a retaining wall, and hand excavations.

Cite this Record

VAFBM-2022-02: Archaeological Monitoring Report for the Narlon Bridge Replacement Project (2019-UPRRN). 2022 ( tDAR id: 492895) ; doi:10.48512/XCV8492895

This Resource is Part of the Following Collections

Individual & Institutional Roles

Contact(s): Roscoe Loetzerich

File Information

  Name Size Creation Date Date Uploaded Access
VAFBM-2022-02_ArchaeoMonitoring_NarlonBridgeReplacement_2019-U... 11.71mb Feb 6, 2024 4:53:01 PM Confidential

Accessing Restricted Files

At least one of the files for this resource is restricted from public view. For more information regarding access to these files, please reference the contact information below

Contact(s): Roscoe Loetzerich