LET-754: SHPO Transmittal Letter Continuing Consultation on the Issuance of a License to the Union Pacific Railroad (UPRR) for the Narlon Bridge Replacement Project
Year: 2013
Summary
This document is a SHPO transmittal letter continuing consultation on the issuance of a license to the Union Pacific Railroad (UPRR), allowing them to use VAFB lands as a temporary construction area during the course of the Narlon Bridge Replacement project. The letter requests concurrence with several federal agency determinations that are outlined in the document and can be found there.
Cite this Record
LET-754: SHPO Transmittal Letter Continuing Consultation on the Issuance of a License to the Union Pacific Railroad (UPRR) for the Narlon Bridge Replacement Project. 2013 ( tDAR id: 493457) ; doi:10.48512/XCV8493457
This Resource is Part of the Following Collections
Individual & Institutional Roles
Contact(s): Roscoe Loetzerich
Record Identifiers
Project ID(s): 813-12-016
VAFB Document Number(s): LET-754
File Information
Name | Size | Creation Date | Date Uploaded | Access | |
---|---|---|---|---|---|
LET-754_SHPO_cont_transmittal_SupRpt_signed_813-12-016.pdfa.pdf | 701.38kb | Nov 1, 2024 3:07:14 PM | Confidential |
Accessing Restricted Files
At least one of the files for this resource is restricted from public view. For more information regarding access to these files, please reference the contact information below
Contact(s): Roscoe Loetzerich