Phase I Archaeological Survey, Road Improvements, AL 119 Between US 31 and I-65, Pelham, ALDOT# STPAA-7136(1), Shelby County, AL
Author(s): Lee A. Luis
Year: 1995
Summary
This resource is a citation record only, the Center for Digital Antiquity does not have a copy of this document. The information in this record has been migrated into tDAR from the National Archaeological Database Reports Module (NADB-R) and updated. Most NADB-R records consist of a document citation and other metadata but do not have the documents themselves uploaded.
If you have a digital copy of the document and would like to have it curated in tDAR, please contact us at comments@tdar.org.
Cite this Record
Phase I Archaeological Survey, Road Improvements, AL 119 Between US 31 and I-65, Pelham, ALDOT# STPAA-7136(1), Shelby County, AL. Lee A. Luis. 1995 ( tDAR id: 50017)
Keywords
Investigation Types
Site Evaluation / Testing
Geographic Keywords
01117 (Fips Code)
•
Alabama (State / Territory)
•
CAHABA RIVER DRAINAGE
•
CAHABA VALLEY
•
North America (Continent)
•
Pelham
•
Shelby (County)
•
Southeast
•
United States of America (Country)
•
Valley and Ridge
Spatial Coverage
min long: -87.027; min lat: 33.019 ; max long: -86.341; max lat: 33.546 ;
Individual & Institutional Roles
Sponsor(s): Alabama Department of Transportation, Montgomery, AL
Prepared By(s): In-house
Record Identifiers
NADB document id number(s): 4058024
NADB citation id number(s): 000000187622
Notes
General Note: Sent from: In-house
General Note: Submitted to: Alabama Department of Transportation, Montgomery, AL