Improvements and Widening of US281 / 62 For 5 Miles North of Porter Hill, F-232(73)
Author(s): John D. Hartley
Year: 1988
Summary
This resource is a citation record only, the Center for Digital Antiquity does not have a copy of this document. The information in this record has been migrated into tDAR from the National Archaeological Database Reports Module (NADB-R) and updated. Most NADB-R records consist of a document citation and other metadata but do not have the documents themselves uploaded.
If you have a digital copy of the document and would like to have it curated in tDAR, please contact us at comments@tdar.org.
Cite this Record
Improvements and Widening of US281 / 62 For 5 Miles North of Porter Hill, F-232(73). John D. Hartley. 1988 ( tDAR id: 63496)
Keywords
Investigation Types
Reconnaissance / Survey
General
34CM224
•
34CM366
•
Lithic Scatter
•
Survey
Geographic Keywords
40031 (Fips Code)
•
Comanche (County)
•
North America (Continent)
•
Oklahoma (State / Territory)
•
United States of America (Country)
Spatial Coverage
min long: -98.826; min lat: 34.406 ; max long: -98.089; max lat: 34.856 ;
Individual & Institutional Roles
Sponsor(s): Department of Transportation; Oklahoma Department of Transportation
Prepared By(s): Oklahoma Department of Transportation
Record Identifiers
NADB document id number(s): 800386
NADB citation id number(s): 000000183993
Notes
General Note: Contract number: F-232(73)
General Note: Submitted to: Oklahoma Department of Transportation
General Note: Sent from: Oklahoma Department of Transportation