Bridge Replacement Over the Washita River Southwest of Clinton, BRS-2020(100)C
Author(s): John D. Hartley
Year: 1986
Summary
This resource is a citation record only, the Center for Digital Antiquity does not have a copy of this document. The information in this record has been migrated into tDAR from the National Archaeological Database Reports Module (NADB-R) and updated. Most NADB-R records consist of a document citation and other metadata but do not have the documents themselves uploaded.
If you have a digital copy of the document and would like to have it curated in tDAR, please contact us at comments@tdar.org.
Cite this Record
Bridge Replacement Over the Washita River Southwest of Clinton, BRS-2020(100)C. John D. Hartley. 1986 ( tDAR id: 68103)
Keywords
Site Type
Bridge
Investigation Types
Reconnaissance / Survey
General
Bridge Replacement
•
Survey
Geographic Keywords
40039 (Fips Code)
•
Custer (County)
•
North America (Continent)
•
Oklahoma (State / Territory)
•
Southwest
•
United States of America (Country)
Spatial Coverage
min long: -99.377; min lat: 35.464 ; max long: -98.623; max lat: 35.813 ;
Individual & Institutional Roles
Sponsor(s): Department of Transportation; Oklahoma ODOT
Prepared By(s): Oklahoma ODOT
Record Identifiers
NADB document id number(s): 800449
NADB citation id number(s): 000000184056
Notes
General Note: Contract number: BRS-2020(100)C
General Note: Submitted to: Oklahoma ODOT
General Note: Sent from: Oklahoma ODOT