Archaeological Survey Report, Construction of Three Truck Passing Lanes, On Route 299 Between Berry Summitand Willow Creek in Humboldt County, 01-HUM-299 PM 29.1 / 38.8 01101-200900 (Caltrans)

Author(s): Barry K. Douglas

Year: 1985

Summary

This resource is a citation record only, the Center for Digital Antiquity does not have a copy of this document. The information in this record has been migrated into tDAR from the National Archaeological Database Reports Module (NADB-R) and updated. Most NADB-R records consist of a document citation and other metadata but do not have the documents themselves uploaded.

If you have a digital copy of the document and would like to have it curated in tDAR, please contact us at comments@tdar.org.

Cite this Record

Archaeological Survey Report, Construction of Three Truck Passing Lanes, On Route 299 Between Berry Summitand Willow Creek in Humboldt County, 01-HUM-299 PM 29.1 / 38.8 01101-200900 (Caltrans). Barry K. Douglas. 1985 ( tDAR id: 71068)

This Resource is Part of the Following Collections

Spatial Coverage

min long: -124.482; min lat: 40.001 ; max long: -123.406; max lat: 41.466 ;

Record Identifiers

NADB document id number(s): 1187258

NADB citation id number(s): 000000154749