Letter Report: Archeological Monitoring for the Amoco Champlin 222 E Well #1 Access Re-Route and Well Pad Construction
Author(s): Michael D. Metcalf
Year: 1979
Summary
This resource is a citation record only, the Center for Digital Antiquity does not have a copy of this document. The information in this record has been migrated into tDAR from the National Archaeological Database Reports Module (NADB-R) and updated. Most NADB-R records consist of a document citation and other metadata but do not have the documents themselves uploaded.
If you have a digital copy of the document and would like to have it curated in tDAR, please contact us at comments@tdar.org.
Cite this Record
Letter Report: Archeological Monitoring for the Amoco Champlin 222 E Well #1 Access Re-Route and Well Pad Construction. Michael D. Metcalf. 1979 ( tDAR id: 76298)
Keywords
Investigation Types
Site Evaluation / Testing
General
Archaeological Monitoring
•
Archeological Monitoring
•
Monitoring
•
No Cultural Resources
•
Significance
•
Well Pad
Spatial Coverage
min long: -107.93; min lat: 40.999 ; max long: -106.068; max lat: 42.435 ;
Individual & Institutional Roles
Sponsor(s): Bureau of Land Management; Amoco Production Company, Riverton, WY
Prepared By(s): Powers Elevation Company, Eagle, Co
Record Identifiers
NADB document id number(s): 902643
NADB citation id number(s): 000000113956
Notes
General Note: Sent from: Powers Elevation Company, Eagle, Co
General Note: Submitted to: Amoco Production Company, Riverton, WY