Phase II Testing of Sites 23Gr533, 23Gr535, and 23Gr537, Within the Northwest Interceptor and Treatment Plant Construction Areas, City of Springfield, Greene County, Missouri: 1983
Author(s): Jack H. Ray; David W. Benn
Year: 1983
Summary
This resource is a citation record only, the Center for Digital Antiquity does not have a copy of this document. The information in this record has been migrated into tDAR from the National Archaeological Database Reports Module (NADB-R) and updated. Most NADB-R records consist of a document citation and other metadata but do not have the documents themselves uploaded.
If you have a digital copy of the document and would like to have it curated in tDAR, please contact us at comments@tdar.org.
Cite this Record
Phase II Testing of Sites 23Gr533, 23Gr535, and 23Gr537, Within the Northwest Interceptor and Treatment Plant Construction Areas, City of Springfield, Greene County, Missouri: 1983. Jack H. Ray, David W. Benn. 1983 ( tDAR id: 78993)
Keywords
Culture
Late Archaic
•
Middle Woodland
Investigation Types
Site Evaluation / Testing
General
23GR533
•
23GR535
•
23GR537
•
Chert Sources
•
Feature
•
geomorphology
•
Lithic Analysis
•
Prehistoric Artifact Scatter
Geographic Keywords
29077 (Fips Code)
•
Greene (County)
•
Missouri (State / Territory)
•
North America (Continent)
•
Sac River
•
United States of America (Country)
Spatial Coverage
min long: -93.626; min lat: 37.089 ; max long: -93.062; max lat: 37.427 ;
Individual & Institutional Roles
Sponsor(s): Environmental Protection Agency; Burns and McDonnell Engineering, Kansas City, MO
Prepared By(s): Southwest Missouri State University, Car-600
Record Identifiers
NADB document id number(s): 5150745
NADB citation id number(s): 000000162150
Notes
General Note: Sent from: Southwest Missouri State University, Car-600
General Note: Submitted to: Burns and McDonnell Engineering, Kansas City, MO