Coal Mine Survey Along Lead Branch in Perry County, Kentucky
Author(s): Andrew P. Bradbury
Year: 1994
Summary
This resource is a citation record only, the Center for Digital Antiquity does not have a copy of this document. The information in this record has been migrated into tDAR from the National Archaeological Database Reports Module (NADB-R) and updated. Most NADB-R records consist of a document citation and other metadata but do not have the documents themselves uploaded.
If you have a digital copy of the document and would like to have it curated in tDAR, please contact us at comments@tdar.org.
Cite this Record
Coal Mine Survey Along Lead Branch in Perry County, Kentucky. Andrew P. Bradbury. 1994 ( tDAR id: 84202)
Keywords
Site Type
Mine
Investigation Types
Site Evaluation / Testing
Geographic Keywords
21193 (Fips Code)
•
Kentucky (State / Territory)
•
North America (Continent)
•
Perry (County)
•
United States of America (Country)
Spatial Coverage
min long: -83.554; min lat: 36.992 ; max long: -83; max lat: 37.444 ;
Individual & Institutional Roles
Sponsor(s): Office of Surface Mining; Nesbitt Engineering, Lexington, Kentucky
Prepared By(s): Cultural Resource Analysts, Inc.
Record Identifiers
NADB document id number(s): 579964
NADB citation id number(s): 000000146307
Notes
General Note: Contract number: 8970355
General Note: Submitted to: Nesbitt Engineering, Lexington, Kentucky
General Note: Sent from: Cultural Resource Analysts, Inc.