Archaeological and Historical Field Reconnaissance Memorandum: Bridge Replacement of Approaches Modification at Crossing of Hell Creek and S.R. 18, Fayette County

Author(s): James W. Parker

Year: 1982

Summary

This resource is a citation record only, the Center for Digital Antiquity does not have a copy of this document. The information in this record has been migrated into tDAR from the National Archaeological Database Reports Module (NADB-R) and updated. Most NADB-R records consist of a document citation and other metadata but do not have the documents themselves uploaded.

If you have a digital copy of the document and would like to have it curated in tDAR, please contact us at comments@tdar.org.

Cite this Record

Archaeological and Historical Field Reconnaissance Memorandum: Bridge Replacement of Approaches Modification at Crossing of Hell Creek and S.R. 18, Fayette County. James W. Parker. 1982 ( tDAR id: 94536)

This Resource is Part of the Following Collections

Spatial Coverage

min long: -87.952; min lat: 33.52 ; max long: -87.424; max lat: 33.92 ;

Individual & Institutional Roles

Sponsor(s): State, County, and Local Government; Alabama Highway Department, Montgomery, AL

Prepared By(s): In-house

Record Identifiers

NADB document id number(s): 4053775

NADB citation id number(s): 000000133765

Notes

General Note: Sent from: In-house

General Note: Submitted to: Alabama Highway Department, Montgomery, AL