Amoco Production Elk Basin Flowline From Battery 10 To Waterflood Station #2
Author(s): Michael D. Metcalf
Year: 1978
Summary
This resource is a citation record only, the Center for Digital Antiquity does not have a copy of this document. The information in this record has been migrated into tDAR from the National Archaeological Database Reports Module (NADB-R) and updated. Most NADB-R records consist of a document citation and other metadata but do not have the documents themselves uploaded.
If you have a digital copy of the document and would like to have it curated in tDAR, please contact us at comments@tdar.org.
Cite this Record
Amoco Production Elk Basin Flowline From Battery 10 To Waterflood Station #2. Michael D. Metcalf. 1978 ( tDAR id: 97545)
Keywords
Material
Fauna
Investigation Types
Site Evaluation / Testing
General
Recent Trash
•
Significance
•
Soil
•
Vegetation
Geographic Keywords
56029 (Fips Code)
•
Bighorn Basin
•
North America (Continent)
•
Park (County)
•
Rocky Mountains
•
United States of America (Country)
•
Upper Yellowstone River Drainage
•
Wyoming (State / Territory)
Spatial Coverage
min long: -111.057; min lat: 43.801 ; max long: -108.551; max lat: 45.006 ;
Individual & Institutional Roles
Sponsor(s): Bureau of Land Management; Amoco Production, Unknown Location
Prepared By(s): Powers Elevation Company, Inc. , Eagle, Co
Record Identifiers
NADB document id number(s): 901648
NADB citation id number(s): 000000112961
Notes
General Note: Submitted to: Amoco Production, Unknown Location
General Note: Sent from: Powers Elevation Company, Inc., Eagle, Co