BLM Cultural Compliance Form: Pioneer Pipeline Company, Construction of a Pump Station Right-Of-Way
Author(s): Andy Morris
Year: 1977
Summary
This resource is a citation record only, the Center for Digital Antiquity does not have a copy of this document. The information in this record has been migrated into tDAR from the National Archaeological Database Reports Module (NADB-R) and updated. Most NADB-R records consist of a document citation and other metadata but do not have the documents themselves uploaded.
If you have a digital copy of the document and would like to have it curated in tDAR, please contact us at comments@tdar.org.
Cite this Record
BLM Cultural Compliance Form: Pioneer Pipeline Company, Construction of a Pump Station Right-Of-Way. Andy Morris. 1977 ( tDAR id: 97666)
Keywords
Investigation Types
Site Evaluation / Testing
General
No Cultural Resources
•
Pipeline
•
Significance
Spatial Coverage
min long: -111.047; min lat: 40.995 ; max long: -110.048; max lat: 41.58 ;
Individual & Institutional Roles
Sponsor(s): Bureau of Land Management; BLM, Unknown Location
Prepared By(s): BLM, Unknown Location
Record Identifiers
NADB document id number(s): 901349
NADB citation id number(s): 000000112662
Notes
General Note: Submitted to: BLM, Unknown Location
General Note: Sent from: BLM, Unknown Location