Correspondence Packet, 1992 Rehabilitation of Hangars 12, 13, and 64, Randolph Air Force Base, Texas
Summary
A group of correspondence concerning rehabilitation projects for Hangars 12, 13, and 64 at Randolph Air Force Base, Texas. Proposed projects includes new entrance canopies, replacement of external doors, and interior rehabilitation.
Cite this Record
Correspondence Packet, 1992 Rehabilitation of Hangars 12, 13, and 64, Randolph Air Force Base, Texas. ( tDAR id: 440435) ; doi:10.48512/XCV8440435
Keywords
Culture
Historic
Site Type
Governmental Structure
•
Historic Governmental Structure
•
Military Structure
•
Non-Domestic Structures
Investigation Types
Architectural Documentation
•
Heritage Management
General
Hangar 12
•
Hangar 13
•
Hangar 64
Geographic Keywords
Bexar (County)
•
Randolph Air Force Base
•
San Antonio
•
Texas
Spatial Coverage
min long: -98.305; min lat: 29.512 ; max long: -98.256; max lat: 29.55 ;
Individual & Institutional Roles
Contact(s): Cultural Resource Office, Joint Base San Antonio
Contributor(s): Department of the Air Force, Randolph Air Force Base; Texas Historical Commission; Advisory Council on Historic Preservation
Repository(s): Fort Sam Houston
Record Identifiers
File(s): 48-17
Resources Inside this Project (Viewing 1-22 of 22)
- Documents (22)
Documents
-
Correspondence Packet, Rehabilitation of Hangars 12, 13, and 64, Randolph Air Force Base, Texas (1992)
DOCUMENT Full-Text Uploaded by: Chelsea Walter
A group of correspondence concerning rehabilitation projects for Hangars 12, 13, and 64 at Randolph Air Force Base, Texas. Proposed projects includes new entrance canopies, replacement of external doors, and interior rehabilitation.
-
Letter from Bill Smith to Scott Shepherd, Hangar 12, Randolph Air Force Base, Texas (1992)
DOCUMENT Full-Text
An email proposing renovation on the west-side parking of Hangar 12 be renovated at Randolph Air Force Base, Texas. Included are spec measurements for the square footage in the entrance, mechanical room, utility area, and north end of the hangar. This letter is part of a group of correspondence concerning rehabilitation projects for Hangars 12, 13, and 64 at Randolph Air Force Base, Texas. Proposed projects includes new entrance canopies, replacement of external doors, and interior...
-
Letter from Heidi Ramroth to Claudia Nissley, Rehabilitation of Hangars 12, 13, and 64, Randolph Air Force Base, Texas (1992)
DOCUMENT Full-Text
A letter sent from the Department of the Air Force at Randolph Air Force Base to the Advisory Council on Historic Preservation. Information regarding prior correspondence. This letter is part of a group of correspondence concerning rehabilitation projects for Hangars 12, 13, and 64 at Randolph Air Force Base, Texas. Proposed projects includes new entrance canopies, replacement of external doors, and interior rehabilitation.
-
Letter from Jack Siegel to Scott Shepherd, Hangar 12 Doors, Randolph Air Force Base, Texas (1992)
DOCUMENT Full-Text
An email discussing a mitigation for the proposed replacement of the original exterior doors of Hangar 12, Randolph Air Force Base, Texas. This letter is part of a group of correspondence concerning rehabilitation projects for Hangars 12, 13, and 64 at Randolph Air Force Base, Texas. Proposed projects includes new entrance canopies, replacement of external doors, and interior rehabilitation.
-
Letter from Joseph Logan to Curtis Tunnell, Hangar 12 SABER/MILCON, Randolph Air Force Base, Texas (1992)
DOCUMENT Full-Text
Background information on the construction and use of Hangar 12 at Randolph Air Force Base, TX. This summary is provided as documentation to be used in a proposed undertaking that may effect the historic structure. This letter is part of a group of correspondence concerning rehabilitation projects for Hangars 12, 13, and 64 at Randolph Air Force Base, Texas. Proposed projects includes new entrance canopies, replacement of external doors, and interior rehabilitation.
-
Letter from Joseph Logan to Scott Shepherd, Hangar 64 Project, Randolph Air Force Base, Texas (1992)
DOCUMENT Full-Text
A handwritten note on the need for cost breakdown for the Hangar 64 project, Randolph Air Force Base, Texas. This note is part of a group of correspondence concerning rehabilitation projects for Hangars 12, 13, and 64 at Randolph Air Force Base, Texas. Proposed projects includes new entrance canopies, replacement of external doors, and interior rehabilitation.
-
Letter from Joseph Logan to Scott Shepherd, Memorandum of Agreement Hangars 12, 13, and 64, Randolph Air Force Base, Texas (1992)
DOCUMENT Full-Text
A letter explaining the Memorandum of Agreement for the proposed undertakings at Hangars 12, 13, and 64, Randolph Air Force Base, Texas. Attached to the letter is the Memorandum of Agreement. This letter is part of a group of correspondence concerning rehabilitation projects for Hangars 12, 13, and 64 at Randolph Air Force Base, Texas. Proposed projects includes new entrance canopies, replacement of external doors, and interior rehabilitation.
-
Letter from Joseph Logan to Scott Shepherd, Teri Kinsey Visit, Randolph Air Force Base, Texas (1992)
DOCUMENT Full-Text
An email discussing an upcoming meeting with Teri Kinsey that includes an overview of Hangars 12, 13 and 64, Buildings 903-907, 208 and 663 at Randolph Air Force Base, Texas. This letter is part of a group of correspondence concerning rehabilitation projects for Hangars 12, 13, and 64 at Randolph Air Force Base, Texas. Proposed projects includes new entrance canopies, replacement of external doors, and interior rehabilitation.
-
Letter from Ritch Woods to Scott Shepherd, Hangars 12 and 13 Entrances, Randolph Air Force Base, Texas (1992)
DOCUMENT Full-Text
An email written with an idea to enhance the proposed undertaking to install canopies at the entrance of Hangar 12 and Hangar 13 at Randolph Air Force Base, Texas. This letter is part of a group of correspondence concerning rehabilitation projects for Hangars 12, 13, and 64 at Randolph Air Force Base, Texas. Proposed projects includes new entrance canopies, replacement of external doors, and interior rehabilitation.
-
Letter from Ritch Woods to Scott Shepherd, Teri Kinsey Visit, Randolph Air Force Base, Texas (1992)
DOCUMENT Full-Text
Further discussion of an upcoming meeting with Teri Kinsey that includes an overview of Hangars 12, 13 and 64, Buildings 903-907, 208 and 663 at Randolph Air Force Base, Texas. This letter is part of a group of correspondence concerning rehabilitation projects for Hangars 12, 13, and 64 at Randolph Air Force Base, Texas. Proposed projects includes new entrance canopies, replacement of external doors, and interior rehabilitation.
-
Letter from Scott Shepherd to McDonald, Section 106 Hangars 12 and 13, Randolph Air Force Base, Texas (1992)
DOCUMENT Full-Text
A handwritten letter concerning interior undertakings at Hangar 12 and Hangar 13, Randolph Air Force Base, Texas. Mostly notes on where each organization is at for approval. This letter is part of a group of correspondence concerning rehabilitation projects for Hangars 12, 13, and 64 at Randolph Air Force Base, Texas. Proposed projects includes new entrance canopies, replacement of external doors, and interior rehabilitation.
-
Letter from Scott Shepherd, Hangar 12, Randolph Air Force Base, Texas (1992)
DOCUMENT Full-Text
An email with attached information on the Section 106 for Hangar 12, Randolph Air Force Base, Texas. The majority of the information is a detailed list of all correspondence that has occurred in relation to Hangars 12, 13, 62, 63, 64, and Building 66 and 100. This letter is part of a group of correspondence concerning rehabilitation projects for Hangars 12, 13, and 64 at Randolph Air Force Base, Texas. Proposed projects includes new entrance canopies, replacement of external doors, and interior...
-
Letter to Scott Shepherd, Correspondence to SHPO, Randolph Air Force Base, Texas (1992)
DOCUMENT Full-Text Uploaded by: Chelsea Walter
A handwritten note concerning correspondence for the proposed rehabilitation of Hangar 12 at Randolph Air Force Base, Texas. This letter is part of a group of correspondence concerning rehabilitation projects for Hangars 12, 13, and 64 at Randolph Air Force Base, Texas. Proposed projects includes new entrance canopies, replacement of external doors, and interior rehabilitation.
-
Letter to the Department of the Air Force, Hangars 12, 13, 64 Section 106, Randolph Air Force Base, Texas (1992)
DOCUMENT Full-Text Uploaded by: Chelsea Walter
An email with notes on a meeting that discussed the specific conditions the State Historic Preservation Office has given for the proposed undertaking to install canopies outside of Hangars 12, 13, and 64 at Randolph Air Force Base, Texas. This letter is part of a group of correspondence concerning rehabilitation projects for Hangars 12, 13, and 64 at Randolph Air Force Base, Texas. Proposed projects includes new entrance canopies, replacement of external doors, and interior rehabilitation.
-
Letters to the Department of the Air Force, Hangars 64 and 12, Randolph Air Force Base, Texas (1992)
DOCUMENT Full-Text Uploaded by: Chelsea Walter
Emails that are items in progress and do not indicate an author. Included are details about a discussion with Terri Kinsey, prior to her visit to Randolph Air Force Base, about Hangars 12 and 64. This letter is part of a group of correspondence concerning rehabilitation projects for Hangars 12, 13, and 64 at Randolph Air Force Base, Texas. Proposed projects includes new entrance canopies, replacement of external doors, and interior rehabilitation.
-
Response from Claudia Nissley to Joseph Logan, Interior Rehabilitation of Hangar 12, Randolph Air Force Base, Texas (1992)
DOCUMENT Full-Text
The Advisory Council has reviewed Randolph Air Force Base's documentation on no adverse effect determination for the proposed interior rehabilitation of Hangar 12. The Council concurs with the determination of no adverse effect. This letter is part of a group of correspondence concerning rehabilitation projects for Hangars 12, 13, and 64 at Randolph Air Force Base, Texas. Proposed projects includes new entrance canopies, replacement of external doors, and interior rehabilitation.
-
Response from Joseph Logan to Claudia Nissley, Rehabilitation of Hangar 12 Interior, Randolph Air Force Base, Texas (1992)
DOCUMENT Full-Text
Randolph Air Force Base is writing the Advisory Council of Historic Preservation to offer summary documentation on a proposed undertaking to rehabilitate the interior of Hangar 12. This letter is part of a group of correspondence concerning rehabilitation projects for Hangars 12, 13, and 64 at Randolph Air Force Base, Texas. Proposed projects includes new entrance canopies, replacement of external doors, and interior rehabilitation.
-
Response from Joseph Logan to Claudia Nissley, Rehabilitation of Hangars 12, 13, and 64, Randolph Air Force Base, Texas (1992)
DOCUMENT Full-Text
A letter in response to a sent Memorandum of Agreement for the proposed undertakings at Hangars 12, 13, and 64, Randolph Air Force Base, Texas. The Advisory Council on Historic reservation has reviewed the document and see it as generally acceptable. Included in the letter are some suggestions on how to improve the Memorandum of Agreement. This letter is part of a group of correspondence concerning rehabilitation projects for Hangars 12, 13, and 64 at Randolph Air Force Base, Texas. Proposed...
-
Response from Joseph Logan to Curtis Tunnell, Hangar 12 Interior Work, Randolph Air Force Base, Texas (1992)
DOCUMENT Full-Text
Correspondence concerning a question about the rehabilitation of the steel casement windows at Hangar 12, Randolph Air Force Base, Texas. This letter is part of a group of correspondence concerning rehabilitation projects for Hangars 12, 13, and 64 at Randolph Air Force Base, Texas. Proposed projects includes new entrance canopies, replacement of external doors, and interior rehabilitation.
-
Response from Joseph Logan to Curtis Tunnell, Interior Rehabilitation of Hangar 12, Randolph Air Force Base, Texas (1992)
DOCUMENT Full-Text
Randolph Air Force Base is writing the Texas Historical Commission to add an additional undertaking to the list of projects approved for Hangar 12. The information concerns the installation of a double set of glass front doors at the north and south ends of the west side of the Hangar. This letter is part of a group of correspondence concerning rehabilitation projects for Hangars 12, 13, and 64 at Randolph Air Force Base, Texas. Proposed projects includes new entrance canopies, replacement of...
-
Response from Stan Graves to Donald Peterson, Hangar 12 Interior Work, Randolph Air Force Base, Texas (1992)
DOCUMENT Full-Text
The National Register Department has conducted a review of Hangar 12 at Randolph Air Force Base, Texas. The Department has determined that the property is eligible for the National Register for Historic Places. The NRHP has also determined that the demolition of in order to remodel the interior will have no adverse effect on the historic, exterior portion of the structure. This letter is part of a group of correspondence concerning rehabilitation projects for Hangars 12, 13, and 64 at Randolph...
-
Response from Stan Graves to Donald Peterson, Rehabilitation of Hangars 12, 13, and 64, Randolph Air Force Base, Texas (1992)
DOCUMENT Full-Text
The Texas Historical Commission has discussed the revised undertakings at Hangars 12, 13, and 64 with the Advisory Council on Historic Preservation and has determined the undertaking to still be an adverse effect on the historic structures. The letter discusses mitigation of the adverse effect. This letter is part of a group of correspondence concerning rehabilitation projects for Hangars 12, 13, and 64 at Randolph Air Force Base, Texas. Proposed projects includes new entrance canopies,...