Randall Faber, IA DOT
No description specified.
1-26 (26 Records)
Documents
- Cultural Resources Evaluation of a Proposed Wetland Mitigation Site Nhsn-5-5(39)--2R-77 A.K.A. PIN 95-77520-5, Warren County, Primary Roads (1998)
- L-6578-B-4 Bridge Replacement, Clay County, a Report to the IA DOT, Secondary Roads (1978)
- Letter Report for Supplemental Phase I Archaeological Investigations Along US Highway 34, MT Pleasant Bypass Project PE-163-2(12)--2A-51 A.K.A. NHS-34-8(43-46)--19-51 and NHS-34-9(79)--19-44 (1998)
- Letter Report: F-149-1(38)--20-54, A.K.A. PIN 85-54040-1, Keokuk County Primary Roads Supplement to Pcr Vol. 15, No 60 (1994)
- Letter Report: F-30-5(31,49,98)--20-64 A.K.A. PIN 71-64060-1, Marshall County Primary Roads Inspection of Additional Right-of-Way (1991)
- Letter Report: F-500-1(5 & 20)--20-77, A.K.A. PIN 77-77190-1,3 Polk County Primary Roads Supplemental Phase I Survey (1992)
- .Letter Report: F-71-7(15)--20-11 A.K.A. Pinbn 70-11020-1 Buena Vista County Primary Roads Borrow Inspection (1991)
- Letter Report: FHWA NHS-71-4(24)--19-05, PIN 91-05020-2, Shouldering Along US 71 from Hamlin North to Audobon - Supplemental Report (1994)
- Letter Report: NHS-18-6(32)--20-34. A.K.A. PIN 90-34060-1, Floyd County Primary Road Rumored Pioneer Grave South of the Town of Floyd, OSA Burial Project # 957 (1996)
- Letter Report: NHS-23-1(19)--19-90 A.K.A. PIN 90-90010-1, Wapello County Primary Roads Wetland Mitigation Survey (1997)
- Letter Report: NHS-30-2(59)--19-14 A.K.A. PIN 85-14010-1, Carroll County Primary Roads Pcr Vol.15, No, 46 (1997)
- Letter Report: NHS-30-5(31)--19-54 A / K / A / PIN 71-64060-1, Marshall County Primary Roads Project Supplemental Inspection (1996)
- Letter Report: NHS-500-1(46)--19-77, A.K.A. PIN 84-77170-1, Polk and Warren Counties, Primary Roads Supplemental Survey (1994)
- Letter Report: NHS-500-1(5)--19-77, A.K.A. PIN 77-77190-1, Polk County Primary Road Supplemental Survey Flood Storage Borrow, Wetland Mitigation Area, Possible Burial Area, Row Parcel 36 (1994)
- Letter Report: NHS-63-8(17)--19-19, A.K.A. PIN 94-19010-1, Chickasaw County Primary Roadds Supplemental Report to Pcr Vol. 18 No. 2 and 26 (1996)
- Letter Report: Stp-10-1(53)--2C-84. A.K.A. PIN 91-84030-2, Sioux County Primary Roads Supplemental Survey (1993)
- Letter Report: Stp-65-7(22)--2C-35, A.K.A. PIN 91-35020-2 (1992)
- Letter Report: Supplemental Cultural Resource Investigations for US Highway 30 Improvement Marshall and Tama Counties, Project NHS-30-=5(1216)--19-64 (1998)
- Letter Report: Supplemental Phase I Archaeological Survey of a Proposed Borrow Area for Bridge Replacement FHWA# 0842101, Project BROS-9010(15)--5E-10 Buchanan County (1998)
- Letter Report: Supplemental Phase I Survey: Two Borrows for Bridge Replacement Project BROS-89(12)--8J-89, Formerly BROS-9089(11)--8J-89. FHWA # 329880, Van Buren County (1995)
- Letter Report: Tsf-71-6(27)--92-81, A.K.A. PIN 90-81020-1, Sac County Primary Roads Supplement to Pcr Vol. 17 No.38 (1994)
- NHS- 137-3(15)--19-62, A.K.A. PIN 91-62070-1 (1998)
- NHS-218-9(67)--19-34 A.K.A. PIN 90-34050-1 Floyd County, Primary Roads, Supplemental Survey for Pcr Vol 17(45) (1998)
- NHS-61-4(55)--19-70, Muscatine County Primary Roads Project Summary (1999)
- Supplemental Inspection Report on Buchanan County Project Stp-150-3(46)--2C-10, A.K.A. PIN 93-10010-1, Letter Report James Collins to Randall Faber, IA DOT (1994)
- Supplemental Resources Investigations for US 30 Improvements Tama County, Project NHS-30-5-(116)--19-64 (1998)