Letter Report: Supplemental Phase I Survey: Two Borrows for Bridge Replacement Project BROS-89(12)--8J-89, Formerly BROS-9089(11)--8J-89. FHWA # 329880, Van Buren County

Author(s): Derrick J. Marcucci

Year: 1995

Summary

This resource is a citation record only, the Center for Digital Antiquity does not have a copy of this document. The information in this record has been migrated into tDAR from the National Archaeological Database Reports Module (NADB-R) and updated. Most NADB-R records consist of a document citation and other metadata but do not have the documents themselves uploaded.

If you have a digital copy of the document and would like to have it curated in tDAR, please contact us at comments@tdar.org.

Cite this Record

Letter Report: Supplemental Phase I Survey: Two Borrows for Bridge Replacement Project BROS-89(12)--8J-89, Formerly BROS-9089(11)--8J-89. FHWA # 329880, Van Buren County. Derrick J. Marcucci. 1995 ( tDAR id: 319375)

This Resource is Part of the Following Collections

Spatial Coverage

min long: -92.18; min lat: 40.599 ; max long: -91.716; max lat: 40.901 ;

Individual & Institutional Roles

Sponsor(s): Federal Highway Administration; Randall Faber, IA DOT

Prepared By(s): Derrick Marcucci, Louis Berger & Assoc.

Record Identifiers

NADB document id number(s): 645742

NADB citation id number(s): 000000311081

Notes

General Note: Submitted to: Randall Faber, IA DOT

General Note: Sent from: Derrick Marcucci, Louis Berger & Assoc.