Federal Highway Administration
No description specified.
Institution Members
5,451-5,500 (6,839 Records)
Documents
- Phase I Cultural Resource Survey for Proposed Road Grading and Widening Greeley Township, Shelby County, and Nishnabotny Township, Crawford County (1993)
- Phase I Cultural Resource Survey for Proposed Road Grading Project Goodrich Denison, Milford and East Boyer Township, Crawford County (1996)
- A Phase I Cultural Resource Survey for Proposed Road Improvement Corriden, Hartburg, Omaha,Grant and Waterman Towmships, O'Brien County, Iowa Project L-0108-1-95 and L-0916--1--97 (1993)
- A Phase I Cultural Resource Survey for Proposed Road Improvement Project Washington County (1991)
- A Phase I Cultural Resource Survey for Proposed Road Improvement Project Washington County (1991)
- A Phase I Cultural Resource Survey for Proposed Road Improvement Project, Washington County (1991)
- Phase I Cultural Resource Survey For Proposed Road Improvements and Associated Borrow Areas, Van Buren County, Iowa (Frm-89(3)--5A-89) (1990)
- A Phase I Cultural Resource Survey for Proposed Road Improvements, City of Maple Grove, Hennepin County, Minnesota (1994)
- A Phase I Cultural Resource Survey for Proposed Road Realignment and Bridge Replacement, Cox Creek Township, Clayton County (1993)
- A Phase I Cultural Resource Survey for Proposed Road Realignment and Culvert Contsruction, Clayton County (1992)
- A Phase I Cultural Resource Survey for Proposed Road Realignment IN Penn Township, Jefferson County (1991)
- A Phase I Cultural Resource Survey for Proposed Road Realignment, Jefferson Township, Ringgold County (1992)
- Phase I Cultural Resource Survey for Proposed Road Widening and Realignment of College Drive, Decorah, Winneshiek County (1993)
- Phase I Cultural Resource Survey For Proposed Sixth Street Extension City of Waterloo, Black Hawk County, Iowa (1990)
- Phase I Cultural Resource Survey for Ravencliff Bridge Replacement, Wyoming County, WV. (1997)
- Phase I Cultural Resource Survey for the First Phase of the Belmont Road Project City of Bettendorf, Scott County (1996)
- Phase I Cultural Resource Survey for the Hess Road to Hawkeye Institute of Tech, Entrance Road, Orange Township, Black Hawk County (1996)
- A Phase I Cultural Resource Survey for the Milton Road Reconstruction Project, Jackson Townhip, Lee County Stp-U-3942(1)--70-56 (1994)
- Phase I Cultural Resource Survey for the North Ridge Trail Extension Project City of Coralville, Johnson County (1994)
- A Phase I Cultural Resource Survey for the Proposed Bridge Replacement and Road Grading Hamilton County, BROS-9040(()--8J-40 FHWA# 172400 (1992)
- Phase I Cultural Resource Survey for the Proposed Buffalo Creek Bridge Replacement and Realignment Project on County Road W45 IN Byron and Fremont Townships, Buchanan County, Iowa. (2001)
- A Phase I Cultural Resource Survey for the Proposed Construction of Stream Control Structures Union Township, Shelby County, Iowa (1993)
- Phase I Cultural Resource Survey For the Proposed GS-66 (Pioneer Trail) Grading, Draining, and Paving Project in Macedonia Township, Pottawattamie County, Iowa (1986)
- A Phase I Cultural Resource Survey for the Proposed Lower Terace Road Extension, Monroe Township, Linn County (1993)
- Phase I Cultural Resource Survey For the Proposed Monument Road and Mynster Springs Road Grading, Draining, and Paving Project in Lake and Hazel Dell Townships, Pottawattamie County, Iowa (1986)
- Phase I Cultural Resource Survey for the Proposed Washburn Area Sanitary Sewage Lagoon IN Cedar Township, Black Hawk County (1996)
- Phase I Cultural Resource Survey for the Realignment of a Segment of Oakdale Road, Clear Creek and Penn Township, Johnson County (1995)
- Phase I Cultural Resource Survey for the Replacement of Bridge FHWA 086950 IN Albion Township, Butler County, Iowa (2001)
- Phase I Cultural Resource Survey for the Replacement of Bridge FHWA 087770 IN Jefferson Township, Butler County, Iowa (2001)
- Phase I Cultural Resource Survey for the Second Phase of the Belmont Road Project City of Bettendorf, Scott County (1996)
- A Phase I Cultural Resource Survey for Two Proposed Borrow Areas IN Pottawattamie County, Sbrc--AS78(1)--8D-78, FHWA 289970 (1991)
- Phase I Cultural Resource Survey for Two Proposed Bridge Replacements and Realignment, Winneshiek County (1992)
- Phase I Cultural Resource Survey of a Landslide Area Above TH 67 in Yellow Medicine County (1996)
- Phase I Cultural Resource Survey of a Proposed Borrow Area in Rockford Township, Pottatwattamie County, Iowa, Bros-9078(74) (1986)
- Phase I Cultural Resource Survey of a Proposed Bridge Replacement and Right-Of-Way Expansion IN Garner Township, Pottawattamie County (1996)
- Phase I Cultural Resource Survey of a Proposed Bridge Replacement and Right-Of-Way Expansion IN Knox Township, Pottawattamie County (1996)
- A Phase I Cultural Resource Survey of a Proposed Channel Change German Township, Kossuth County (1993)
- A Phase I Cultural Resource Survey of a TH 55 Corridor from Co. Rd. 116 to Mohawk Drive in Medina, Minnesota (1995)
- Phase I Cultural Resource Survey of Borrow Pit and Wetland Mitigation Site No. 5, U.S. Route 113, Milford to Georgetown, Sussex County, Delaware (1993)
- Phase I Cultural Resource Survey of Bridge Project, C-032, Lime Creek Township, Washington County (1997)
- A Phase I Cultural Resource Survey of CSAH 41 (SP52-641-02), Nicollet County, Minnesota, from TH 14 to 1.4 Miles Southwest (1994)
- A Phase I Cultural Resource Survey of Interstate 35, Des Moines to Ankeny, Delaware and Douglas Townships, Polk County, Iowa (2001)
- Phase I Cultural Resource Survey of Proposed Borrow Area Project No. L-508, Site #2 Project Er-CO22(25)--58-22 IN Wagner Township, Clayton County, Iowa, BCA #778 (1999)
- A Phase I Cultural Resource Survey of Proposed Borrow Areas and US 18 / 218 Alternates Floyd County, Supplement to a Cultural Resource Investigation of the US 18 / 2 / 8 Inprovement Corridor Road to Charles City, Floyd County (1993)
- Phase I Cultural Resource Survey of Proposed Borrow Pits and Monitoring of Topsoil Stripping for TH 12 at the Washington Creek Site 21ME14 (Draft & Final) (1995)
- Phase I Cultural Resource Survey of Proposed Bridge Replacement and Borrow Activities, Pottawattamie County (1992)
- Phase I Cultural Resource Survey of Proposed Bridge Replacement and Right-Of-Way Expansion IN Hazel Dell Township, Pottawattamie County (1996)
- Phase I Cultural Resource Survey of Proposed Bridge Replacement and Right-Of-Way Expansion IN Norwalk Township, Pottawattamie County BROS-78(91) (1996)
- A Phase I Cultural Resource Survey of Proposed Bridge Replacement and Right-Of-Way Expansion IN Pleasant Township, Pottawattamie County Shelby Township, Shelby County BROS78(92) (1996)
- A Phase I Cultural Resource Survey of Proposed Road Improvements and Bridge Replacement (Rattley Bridge), Grove Township, Davis County, Iowa, FHWA No. 132900, BCA #900 (2000)