Nancy Ross-Stallings
No description specified.
151-188 (188 Records)
Documents
- A Phase I Cultural Resource Survey of Permit Number 898-0266, Amendment 1 in Pike County, Kentucky (1991)
- Phase I Cultural Resource Survey of Proposed Permit 867-9004 Letcher County, Kentucky (1991)
- Phase I Cultural Resource Survey of the 2.0 Acre Lily Tulip Capacitor Bank Project, Nelson County, Kentucky (1992)
- Phase I Cultural Resource Survey of the 2.5 Acre Richardson Electric Substation Located Near Independence, Kenton County, Kentucky (1994)
- Phase I Cultural Resource Survey of the Chatteroi Street Connector, Ashland, Boyd County, Kentucky (1994)
- Phase I Cultural Resource Survey of the Darwin Thomas Substation Located Near Elk Creek, Spencer County, Kentucky (1996)
- A Phase I Cultural Resource Survey of the Glasgow Bypass, Barren County, Kentucky (1996)
- Phase I Cultural Resource Survey of the Jacksonville Substation Located Near Brentsville, Bourbon County, Kentucky (1996)
- Phase I Cultural Resource Survey of the Millersburg Substation, Nicholas County, Kentucky (1996)
- Phase I Cultural Resource Survey of the Proposed Improvement of Westport Road, Jefferson County, Kentucky (1995)
- A Phase I Cultural Resource Survey of the Proposed US 460 Realignment Corridor, Camargo to Jeffersonville, Montgomery County, Kentucky (1996)
- A Phase I Cultural Resource Survey of the Proposed Widening and Realignment of KY 22, Oldham County, Kentucky (1996)
- A Phase I Cultural Resource Survey of the Stanford Substation Located Near Stanford, Lincoln County, Kentucky (1996)
- Phase I Cultural Resource Survey of the US 27 Highway Corridor Near Burnside, Pulaski County, Kentucky (1994)
- Phase I Cultural Resource Survey of the US 60 Morganfield Bypass, Union County, Kentucky (1993)
- A Phase I Cultural Resource Survey of Two 100x100 Foot Water Tank Sites Located in Northern Russell County, Kentucky (1993)
- Phase I Cultural Resource Survey of Two Alternates of the Proposed West Irvine To North Irvine Road Connector Located at Irvine, Estill County, Kentucky (1993)
- A Phase I Cultural Resource Survey of Two Borrow Sites Near Falls of Rough Grayson County, Kentucky (1991)
- A Phase I Cultural Resource Survey of Two Borrow Sites Located Near the Cumberland River, Knox County, Kentucky (1992)
- A Phase I Cultural Resource Survey of Two Borrow Sites Located Near Broad Run, Jefferson County, Kentucky (1996)
- A Phase I Cultural Resource Survey of Two Borrow Sites Located Near Hartford, Ohio County, Kentucky (1996)
- A Phase I Cultural Resource Survey of Two Borrow Sites, Nelson and LaRue Counties, Kentucky (1992)
- A Phase I Cultural Resource Survey of Two Water Tank Sites Near Monticello, Wayne County, Kentucky (1994)
- Phase I Cultural Resource Surveys of Three Water Tank Sites for Fleming County Water Association in Fleming County, Kentucky (1991)
- A Phase I Survey of a Section of the US 60 Morganfield Bypass and Phase II Testing of 15Un175 and 15Un176, Morganfield, Union County, Kentucky (1995)
- Phase II Archaeological Investigation of Site 15HD478 Located Near Elizabethtown, Hardin County, Kentucky (1996)
- Phase II Archaeological Testing at 15Fd55 Located Near Beaver, Floyd County, Kentucky (1992)
- Phase II Archaeological Testing at 15Gy85 Located Near Falls of Rough, Grayson County, Kentucky (1991)
- Phase II Archaeological Testing at Site 15Cr71: An Addendum to Additional Testing at Sites 15Cr61, 15Cr62, 15Cr64, and 15Lw145, Sections 32 and 35 of the AA Highway Carter and Lewis Counties, Kentucky (1991)
- Phase II Archaeological Testing at Site 15Cr96. An Addendum to: Additional Archaeological Testing at Sites 15Cr61, 15Cr62, 15Cr64, and 15Lw145, Sections 32 and 35 of the AA Highway Carter and Lewis Counties, Kentucky (1991)
- Phase II Archaeological Testing at Sites 15Cr23 and 15Cr68: An Addendum to: Additional Archaeological Testing at Sites 15Cr61, 15Cr62, 15Cr64, and 15Lw145, Sections 32 and 35 of the AA Highway, Carter and Lewis Counties, Kentucky (1992)
- Phase II Archaeological Testing of 15Js115, the Kentucky Mills Site Nicholasville, Jessamine County, Kentucky (1992)
- Phase II Testing of a Portion of 15HT70 Located Near Bonnieville, Hart County, Kentucky (1994)
- Phase II Testing of a Portion of Site 15CR122, Carter City, Carter County, Kentucky (1993)
- Phase II Testing of a Portion of Site 15Lo182 Located Near Ferguson, Logan County, Kentucky (1997)
- Phase II Testing of the Mims Site (15BB51) Located Along Paris Pike Bourbon County, Kentucky (2000)
- Phase III Archaeological Investigations at the Froman Site (15CL51): An Early Late Woodland Habitation in Carroll County, Kentucky (1996)
- Phase III Mitigation at Sites 15Cr61 and 15Cr64, Located Near Grayson, Carter County, Kentucky (1995)