Ken Duerksen
No description specified.
1-45 (45 Records)
Documents
- Addendum Phase II Survey Report: Addington, Inc., Permit D-0927 (Formerly Application 1049 Vanport, Inc.), Elizabeth Township, Lawrence County, Ohio (1991)
- Cultural Resources Survey of a 5.5 Mile Proposed Widening of US 25, Lexington-Georgetown Road, Scott and Fayette Counties, Kentucky (1993)
- Kramer Points and Fayette Thick Ceramics: Data Recovery at the West Runway Site (15Be391), an Upland Early Woodland Camp in Boone County, Kentucky (1994)
- Phase I / II and III Cultural Resources Report on Columbia Gas Transmission Corporation's 1. 6 Mile Natural Gas Pipeline L-3227 in Holmes County, Ohio (1991)
- Phase I and II Cultural Resource Investigations for the 1. 9 Mile Proposed Symmes Road Extension, Fairfield and Union Townships, Butler County, Ohio (2000)
- Phase I and II Cultural Resources Investigation of a Proposed 8.5 Mile Bike Path in Turtle Creek and Union Townships, Warren County, Ohio (1994)
- Phase I and II Cultural Resources Survey For Columbia Gas Transmission Corporation's Two Proposed Replacement Pipeline Sections, Hocking County, Ohio (1991)
- Phase I and II Cultural Resources Survey for Dayton Power and Light's Proposed Clarksburg 345 / 69 Kv Substation, Perry Township, Pickaway County, Ohio (1992)
- Phase I and II Cultural Resources Survey For the Proposed Kiesland Business Park in Fairfield Township, Butler County, Ohio (1993)
- Phase I and II Cultural Resources Survey of a 157.6 Acre Proposed Surface Coal Mine Area (Permit Application #1194), Hocking County, Ohio (1991)
- Phase I and II Cultural Resources Survey of a 391.2 Acre Proposed Coal Mine Area (Permit #1202) For Addington Coal, Inc. in Lawrence County, Ohio (1991)
- Phase I and II Cultural Resources Survey of a Four Acre Proposed Water Treatment Facility in the Village of Manchester, Adams County, Ohio (1993)
- Phase I and II Cultural Resources Survey of an 80 Acre Tract in Fairfield Township, Butler County, Ohio (1994)
- Phase I Cultural Resource Investigations for a Proposed Cell Tower Site, Israel Township, Preble County, Ohio (2001)
- Phase I Cultural Resource Investigations for a Proposed Cell Tower Site, Milford Township, Butler County, Ohio (2001)
- Phase I Cultural Resource Survey for a CNG Transmission Corporation Division III Pipeline Replacement in Calhoun, Harrison, and Ritchie Counties, West Virginia : FINAL (1993)
- Phase I Cultural Resource Survey of 250 Acres of Proposed Surface Coal Mine Area (Permit Applications #D-0594-7 and #D-0594-8), Jackson County, Ohio (1995)
- Phase I Cultural Resource Survey of a 38.9 Acre Proposed Surface Coal Mine Area (Permit Application #D-0968-1), Jackson County, Ohio (1995)
- Phase I Cultural Resource Survey of Designated Portions of a 319.5 Acre Proposed Surface Coal Mine Area, (Application #1388) Jackson County, Ohio (1995)
- Phase I Cultural Resources Report for 43 Proposed Well-Head Locations and Associated Access Roads in Boone and Lincoln Counties, West Virginia (1996)
- Phase I Cultural Resources Report for 43 Proposed Well-Head Locations and Associated Access Roads in Boone and Lincoln Counties, West Virginia (1996)
- Phase I Cultural Resources Report For Approximately One Acre of County Property, Proposed For Deep Mine Subsidence Control, Richland Township, Belmont County, Ohio (1994)
- Phase I Cultural Resources Report for CNG Transmission Corporation's Proposed 500 foor Natural Gas Pipeline in Jackson County, West Virginia (1996)
- Phase I Cultural Resources Report for Texas Eastern Transmission Corporation's Batesville Discharge Line 1 Replacement in Butler County, Ohio (1997)
- Phase I Cultural Resources Report for Texas Eastern Transmission Corporation's Summerfield Discharge Line 3 Retest in Monroe and Noble Counties, Ohio (1997)
- Phase I Cultural Resources Report for the Phase I Archaeological Survey of Approximately 200 Acres of Bennoc Coal Co. 'S Proposed Surface Coal Mine Area (Permit Applic. #1363), Wayne Township, Belmont County, Ohio (1996)
- Phase I Cultural Resources Report for the Phase I Archaeological Survey of Approximately 400 Acres of R&F Coal Company's Proposed Egypt Valley West Adjacent 1 Surface Coal Mine Area (Permit D-1062-1), Warren Township, Belmont County, Ohio (1996)
- Phase I Cultural Resources Survey For a Proposed 2.93 Mile Waterline For the Village of Bainbridge, Ross County, Ohio (1995)
- Phase I Cultural Resources Survey for a Proposed Bridge Replacement, Hill Station Road, Clermont County, Ohio. Cle-CR 162-0. 92 (P. I. D. 14988). (1998)
- Phase I Cultural Resources Survey for a Proposed Bridge Replacement, Stonelick-Williams Corner Road, Stonelick Township, Clermont County, Ohio (1997)
- Phase I Cultural Resources Survey for a Proposed Liquid Fuel Booster Pump Station in Morgan Township, Butler County, Ohio (1996)
- Phase I Cultural Resources Survey For a Proposed Substation (5.0 Acres) and Three 0.3 Mile Connecting Electric Lines in Brush Creek Township, Highland County, Ohio (1995)
- Phase I Cultural Resources Survey of a 12 Acre Ancillary Work Area Associated with the Relocation of US 35 in Ross County, Ohio. Addendum I to Previously Prepared Report. (1996)
- Phase I Cultural Resources Survey of a 4 Acre Ancillary Work Area Associated with the Relocation of US 35, in Ross County, Ohio. Addendum II to the Previously Prepared Report. (1996)
- Phase I Cultural Resources Survey of a Proposed 150. 9 Acre Surface Coal Mine Area, Coshocton County, Ohio, #1398 (1996)
- Phase I Cultural Resources Survey of a Proposed Energy Generating Facility for Dpl Energy, Inc., Greenville Township, Darke County, Ohio (1999)
- Phase I Cultural Resources Survey of Buckeye Industrial Mining Company's Proposed Surface Coal Mining Project (Permit #1410) Columbiana County, Ohio (1998)
- Phase I Cultural Resources Survey of Buckeye Industrial Mining Company's Proposed Surface Coal Mining Project in Columbiana County, Ohio (1997)
- A Phase I Cultural Resources Survey of Designated Portions of the Proposed Pinnacle Natural Gas Pipeline Extension, Robertson County, Texas (1997)
- Phase I Cultural Resources Survey of DP & L's Proposed 5. 67 Mile Eldean 138 Kv Transmission Project in Miami County, Ohio (1998)
- A Phase I Cultural Resources Survey of Seven Proposed Ancillary Work Areas for the Proposed Relocation of a Portion of US 35, Fayette and Ross Counties, Ohio (1996)
- Phase I Cultural Resources Survey of Three Proposed Waterline Realignments for the Village of Bainbridge, Ross County, Ohio (1995)
- Phase II Cultural Resources Survey For Portions of Site 33Hi56 Corresponding With a 0.3 Mile Connecting Powerline in Brush Creek Township, Highland County, Ohio (1995)
- Phase III Archaeological Testing of Five Sites Along a Proposed AT&T Fiber Optic Cable Line, Clinton and Warren Counties, Ohio (1991)
- Report On the Archaeological Data Recovery at 33Bu477, a Late Maple Creek Phase Occupation in Butler County, Ohio (1994)