Phase I and II Cultural Resources Survey for Dayton Power and Light's Proposed Clarksburg 345 / 69 Kv Substation, Perry Township, Pickaway County, Ohio

Author(s): Ken Duerksen; Christopher A. Bergman

Year: 1992

Summary

This resource is a citation record only, the Center for Digital Antiquity does not have a copy of this document. The information in this record has been migrated into tDAR from the National Archaeological Database Reports Module (NADB-R) and updated. Most NADB-R records consist of a document citation and other metadata but do not have the documents themselves uploaded.

If you have a digital copy of the document and would like to have it curated in tDAR, please contact us at comments@tdar.org.

Cite this Record

Phase I and II Cultural Resources Survey for Dayton Power and Light's Proposed Clarksburg 345 / 69 Kv Substation, Perry Township, Pickaway County, Ohio. Ken Duerksen, Christopher A. Bergman. 1992 ( tDAR id: 323017)

This Resource is Part of the Following Collections

Spatial Coverage

min long: -84.82; min lat: 38.403 ; max long: -80.518; max lat: 42.327 ;

Individual & Institutional Roles

Sponsor(s): State, County, and Local Government

Record Identifiers

NADB document id number(s): 33278

NADB citation id number(s): 000000378145