Thomas M. Shelby
No description specified.
51-96 (96 Records)
Documents
- A Cultural Resources Survey of the Proposed York Cellular Tower in Sumter County, Alabama (2000)
- A Cultural Resources Survey of Three Proposed Cellular Towers in Jackson, Marshall, and Madison Counties, Alabama (2000)
- A Cultural Resources Survey of Three Proposed Cellular Towers in Mississippi (1999)
- A Cultural Resources Survey of Twelve Proposed Cellular Towers in Alabama (1999)
- A Cultural Resources Survey of Two Proposed Borrow Pits Near Columbiana, Shelby County, Alabama (2001)
- A Cultural Resources Survey of Two Proposed Cellular Towers in Monroe County, Mississippi (1999)
- Management Summary: a Phase I Cultural Resources Reconnaissance of the Proposed Bessemer-Tuscaloosa APCO Transmssion Line Tap to Airport Lane, Jefferson County, Alabama (2000)
- Management Summary: a Phase I Cultural Resources Reconnaissance of the Proposed Gadsden Airport Industrial Park, Etowah County, Alabama (2000)
- A Phase I Archaeological and Historical Reconnaissance of a Proposed Cellular Tower Site in Chattanooga, Hamilton County, Tennessee (2000)
- A Phase I Archaeological and Historical Reconnaissance of Five Proposed Cellular Tower Sites in Tennessee (2000)
- A Phase I Archaeological and Historical Resources Reconnaissance of the 7.4 Mile Phillips Petroleum Company Whitson Transmission Pipeline in Northern Tuscaloosa County, Alabama (2001)
- A Phase I Cultural Resources Reconnaissance of a Portion of the Proposed Swan Creek Greenway, Athens, Alabama (2002)
- A Phase I Cultural Resources Reconnaissance of a Proposed Borrow Pit Near Leeds, Jefferson County, Alabama (2002)
- A Phase I Cultural Resources Reconnaissance of a Proposed Land Easement from the Tennessee Valley Authority to the Alabama Department of Conservation and Natural Resources on the Wheeler National Wildlife Refuge, Limestone County, Alabama (2001)
- A Phase I Cultural Resources Reconnaissance of a Proposed Widening of Sutton Road from Taylor Road to U.S. Highway 431, Madison County, Alabama (2002)
- A Phase I Cultural Resources Reconnaissance of an 87 Acre Sampling Area of the McLemore Wetlands Mitigation Bank Project, Montgomery County, Alabama (2002)
- A Phase I Cultural Resources Reconnaissance of Five Proposed Bridge Replacements on U.S. Highway 80, Macon County, Alabama (2000)
- A Phase I Cultural Resources Reconnaissance of the 200 Acre Opp Site, Covington County, Alabama (2001)
- A Phase I Cultural Resources Reconnaissance of the 200 Acre Pinckard Site, Dale County, Alabama (2001)
- A Phase I Cultural Resources Reconnaissance of the Proposed 256 Acre Steele Industrial Park, St. Clair County, Alabama (2000)
- A Phase I Cultural Resources Reconnaissance of the Proposed 350 Acre Centre-Piedmont Regional Airport, Cherokee County, Alabama (2001)
- A Phase I Cultural Resources Reconnaissance of the Proposed 4.5 Mile Corridor V from Three Miles West of Russellville to the US Highway 43 Interchange, Franklin County, Alabama (2001)
- A Phase I Cultural Resources Reconnaissance of the Proposed Bessemer-Tuscaloosa APCO Transmission Line Tap to Airport Lane, Jefferson County, Alabama (2000)
- A Phase I Cultural Resources Reconnaissance of the Proposed Capstone Corridor Roadway Project Near Brookwood, Tuscaloosa County, Alabama (2001)
- A Phase I Cultural Resources Reconnaissance of the Proposed Expansion of the South Marengo Water System, Marengo County, Alabama (2001)
- A Phase I Cultural Resources Reconnaissance of the Proposed Gadsden Airport Industrial Park, Etowah County, Alabama (2000)
- A Phase I Cultural Resources Reconnaissance of the Proposed Health and Wellness Facility at Stillman College, Tuscaloosa, Alabama (2000)
- A Phase I Cultural Resources Reconnaissance of the State Route 118 / US Highway 43 / 78 Expansion Corridor from Just West of Winfield to Guin, Marion County, Alabama (2001)
- A Phase I Cultural Resources Reconnaissance of the State Route 22 Expansion Corridor from Selma to Valley Grande, Dallas County, Alabama (2001)
- A Phase I Cultural Resources Reconnaissance of the U.S. Highway 82 Expansion Corridor from Just West of Reform, Pickens County, Alabama to the Mississippi State Line (2001)
- A Phase I Cultural Resources Reconnaissance of the West Blocton Mine No. 1, Bibb County, Alabama (2002)
- A Phase I Cultural Resources Survey of a Proposed Cellular Tower in Marshall County, Alabama (2000)
- A Phase I Cultural Resources Survey of a Proposed Cellular Tower in Verona, Lee County, Mississippi (2000)
- Phase I Cultural Resources Survey of the Proposed Land Energy, Ltd. Project, Marion, Walker, and Winston Counties, Alabama (2001)
- A Phase I Cultural Resources Survey of Three Proposed Cellular Towers in Lowndes and Lee Counties, Mississippi (2000)
- A Phase I Cultural Resources Survey of Two Proposed Borrow Pits Near Opelika, Lee County, Alabama (2001)
- A Polychrome Modeled Narrative of Late to Terminal Classic Power at Lamanai, Belize (2001)
- Rock Creek Bridge, Winston County, Alabama (2002)
- A Section 106 Survey for the Proposed New Castle Cellular Tower, Jefferson County, Alabama (2001)
- A Section 106 Survey for the Proposed Sumiton Cellular Tower, Walker County, Alabama (2001)
- A Section 106 Survey of the Proposed Creswell Cellular Tower in Shelby County, Alabama (2000)
- A Section 106 Survey of the Proposed Duncanville Cellular Tower, Tuscaloosa County, Alabama (2001)
- A Section 106 Survey of the Proposed Franklin Cellular Tower in Macon County, Alabama (2000)
- A Section 106 Survey of the Proposed Hicks Cellular Tower Near Oxford, Calhoun County, Alabama (2001)
- A Section 106 Survey of the Proposed Mountain Gap Cellular Tower in Marshall County, Alabama (2000)
- A Section 106 Survey of the Proposed Perry's Mill Cellular Tower in Montgomery County, Alabama (2000)