A Phase I Cultural Resources Reconnaissance of the State Route 118 / US Highway 43 / 78 Expansion Corridor from Just West of Winfield to Guin, Marion County, Alabama

Author(s): Thomas M. Shelby

Year: 2001

Summary

This resource is a citation record only, the Center for Digital Antiquity does not have a copy of this document. The information in this record has been migrated into tDAR from the National Archaeological Database Reports Module (NADB-R) and updated. Most NADB-R records consist of a document citation and other metadata but do not have the documents themselves uploaded.

If you have a digital copy of the document and would like to have it curated in tDAR, please contact us at comments@tdar.org.

Cite this Record

A Phase I Cultural Resources Reconnaissance of the State Route 118 / US Highway 43 / 78 Expansion Corridor from Just West of Winfield to Guin, Marion County, Alabama. Thomas M. Shelby. 2001 ( tDAR id: 256428)

This Resource is Part of the Following Collections

Spatial Coverage

min long: -88.207; min lat: 33.915 ; max long: -87.634; max lat: 34.321 ;

Individual & Institutional Roles

Sponsor(s): State, County, and Local Government; Alabama Department of Transportation, Montgomery, AL

Prepared By(s): Office of Archaeological Services, Univ of Alabama Museums

Record Identifiers

NADB document id number(s): 4063301

NADB citation id number(s): 000000260361

Notes

General Note: Sent from: Office of Archaeological Services, Univ of Alabama Museums

General Note: Submitted to: Alabama Department of Transportation, Montgomery, AL