Private (Southern California Edison)
No description specified.
1-10 (10 Records)
Documents
- Archaeological Impact Assessment of Transmission Tower Replacement and Access Road Improvement Associated With the Whisky Creek To To Tom's Place Portion of the Rush Creek To Control Substation T / L, Mono County, California (1988)
- Archaeological Impact Assessment of Wood Pole Placement Along the McGee 12Kv Distribution Line, 1988 Rebuild Between Sherwin Substation and Fobes 40 Motel, Mono County, California (1988)
- Archaeological Planning Assessment: Reconnaissance of Wood Pole Replacement Along the McGee 12 Kv Distrabution Line, 1989 Rebuild Between Fobes 40 Motel and Hilton Creek, Mono County (1988)
- Cultural Resources Inventory for Proposed Modification of the Spillway On Intake Number Two Dam, Bishop Creek Hydroelectric Project (FERC Project 1394) Inyo County, California (1988)
- Cultural Resources Inventory of the Bodie Road-Bridgeport 16 Kv D / L, Southern Portion, Bodie Road To Willow Springs (1986)
- Evaluation of the Historic Resources of the Bishop Creek Hydroelectric System (1988)
- Historic Overview of the Rush Creek and Lee Vining Creek Hydroelectric Projects (1988)
- Results of the 1984 Field Season, Cultural Resources Survey for the Historic an Archaeological Preservation Plan For Eastern Sierra Hydroelectric Projects in Mono and Inyo Counties: Lundy, Lee Vining, Rush Creek and Bishop Creek (1985)
- Results of the 1985 Field Season, Cultural Resources Survey for the Historic and Archaeological Preservation Plan For Eastern Sierra Hydroelectric Projects in Mono County, California: Lee Vining (FERC #1388) and Rush Creek (FERC #1389) (1988)
- Results of the 1986 Field Season, Cultural Resources Survey for the Historic and Archaeological Preservation Plan For the Bishop Creek Hydroelectric Project (FERC Project 1394), Inyo County, California; Part II, South Fork Diversion (1986)