Results of the 1986 Field Season, Cultural Resources Survey for the Historic and Archaeological Preservation Plan For the Bishop Creek Hydroelectric Project (FERC Project 1394), Inyo County, California; Part II, South Fork Diversion
Author(s): David R. M. White
Year: 1986
Summary
This resource is a citation record only, the Center for Digital Antiquity does not have a copy of this document. The information in this record has been migrated into tDAR from the National Archaeological Database Reports Module (NADB-R) and updated. Most NADB-R records consist of a document citation and other metadata but do not have the documents themselves uploaded.
If you have a digital copy of the document and would like to have it curated in tDAR, please contact us at comments@tdar.org.
Cite this Record
Results of the 1986 Field Season, Cultural Resources Survey for the Historic and Archaeological Preservation Plan For the Bishop Creek Hydroelectric Project (FERC Project 1394), Inyo County, California; Part II, South Fork Diversion. David R. M. White. 1986 ( tDAR id: 172703)
Keywords
Site Name
CA-INY-3448
•
CA-INY-3449
•
CA-INY-3450
Investigation Types
Site Evaluation / Testing
General
1394 (FERC Project No.)
•
47 PP
•
Cultural Resource
•
Hydroelectric Project
•
Mf #2427
•
Preservation
Geographic Keywords
06027 (Fips Code)
•
California (State / Territory)
•
Inyo (County)
•
MT. Thompson 7.5' quad
•
North America (Continent)
•
Owens Valley Region
•
Tungsten Hills 7.5' quad
•
United States of America (Country)
Temporal Keywords
Historic
Spatial Coverage
min long: -118.79; min lat: 35.787 ; max long: -115.648; max lat: 37.465 ;
Individual & Institutional Roles
Sponsor(s): Private (Southern California Edison)
Prepared By(s): Southern California Edison
Record Identifiers
NADB document id number(s): 1082599
NADB citation id number(s): 000000022389
Notes
General Note: Submitted to: Private (Southern California Edison)
General Note: Sent from: Southern California Edison