Patayan (Culture Keyword)

101-104 (104 Records)

Survey and Excavations in Joshua Tree National Monument: Report of the 1985 Joshua Tree Road Improvements Project (1985)
DOCUMENT Full-Text Richard G. Ervin.

In the spring of 1985, archeologists from the Western Archeological and Conservation Center (WACC) conducted archeological investigations at Joshua Tree National Monument in sonthern California. This undertaking, which was designated project JOTR 85A in WACC files, was carried out in response to plans for repairing and widening the system of roads in the monument (Package 173). The JOTR 85A project was specifically connected to Phases II and III of the road repair project. Road construction for...


Trails, Rock Features, and Homesteading in the Gila Bend Area: A Report on the State Route 85, Gila Bend to Buckeye Archaeological Project (2008)
DOCUMENT Full-Text Uploaded by: adam brin

The Arizona Department of Transportation plans to widen State Route 85 to a four-lane freeway in the area between Buckeye and Gila Bend. This report presents the results of archaeological data recovery investigations conducted along State Route (SR) 85 for the Arizona Department of Transportation (Contract No. 02-59) by a research team assembled by the Office of Cultural Resource Management, Department of Anthropology at Arizona State University. The Area of Potential Effect (APE) was located...


Treatment and Data Recovery Plan for the SRP Palo Verde to Pinal West 500 kV Transmission Line, Maricopa and Pinal Counties, Arizona (2007)
DOCUMENT Full-Text T. Kathleen Henderson.

Salt River Project Agricultural  Improvement and  Power District  (SRP)  plans  to construct a new  500  kV  transmission  line  between  the  existing  Hassayampa  Switchyard,  west  of Phoenix, Maricopa County, Arizona, and the proposed Pinal West Substation, western Pinal County, Arizona (Figure 1). Designated the Palo Verde to Pinal West (PV-PW) transmission line,  this  powerline  is  the  first  of two  that SRP  plans  to  eventually  construct between  the Hassayampa  Switchyard  and...


West of the Maricopa Mountains: A Cultural Resources Inventory in Support of the Proposed Gila River Transmission Project (2001)
DOCUMENT Full-Text J. Simon Bruder. Cara Lonardo. A.E. (Gene) Rogge.

APS proposes to construct (1) two parallel 500 kilovolt (kV) transmission lines within a 450-foot-wide right-of-way, (2) an 80-acre 500kV switchyard, and (3) a 230kV interconnection line in Maricopa County. The project will provide transmission interconnection for the Panda Gila River generating station to the Western Systems Coordinating Council transmission grid.