In the spring of 1985, archeologists from the Western Archeological and Conservation Center (WACC) conducted archeological investigations at Joshua Tree National Monument in sonthern California. This undertaking, which was designated project JOTR 85A in WACC files, was carried out in response to plans for repairing and widening the system of roads in the monument (Package 173). The JOTR 85A project was specifically connected to Phases II and III of the road repair project. Road construction for...
Trails, Rock Features, and Homesteading in the Gila Bend Area: A Report on the State Route 85, Gila Bend to Buckeye Archaeological Project (2008)
The Arizona Department of Transportation plans to widen State Route 85 to a four-lane freeway in the area between Buckeye and Gila Bend. This report presents the results of archaeological data recovery investigations conducted along State Route (SR) 85 for the Arizona Department of Transportation (Contract No. 02-59) by a research team assembled by the Office of Cultural Resource Management, Department of Anthropology at Arizona State University. The Area of Potential Effect (APE) was located...
Treatment and Data Recovery Plan for the SRP Palo Verde to Pinal West 500 kV Transmission Line, Maricopa and Pinal Counties, Arizona (2007)
Salt River Project Agricultural Improvement and Power District (SRP) plans to construct a new 500 kV transmission line between the existing Hassayampa Switchyard, west of Phoenix, Maricopa County, Arizona, and the proposed Pinal West Substation, western Pinal County, Arizona (Figure 1). Designated the Palo Verde to Pinal West (PV-PW) transmission line, this powerline is the first of two that SRP plans to eventually construct between the Hassayampa Switchyard and...
West of the Maricopa Mountains: A Cultural Resources Inventory in Support of the Proposed Gila River Transmission Project (2001)
APS proposes to construct (1) two parallel 500 kilovolt (kV) transmission lines within a 450-foot-wide right-of-way, (2) an 80-acre 500kV switchyard, and (3) a 230kV interconnection line in Maricopa County. The project will provide transmission interconnection for the Panda Gila River generating station to the Western Systems Coordinating Council transmission grid.