West of the Maricopa Mountains: A Cultural Resources Inventory in Support of the Proposed Gila River Transmission Project

Summary

APS proposes to construct (1) two parallel 500 kilovolt (kV) transmission lines within a 450-foot-wide right-of-way, (2) an 80-acre 500kV switchyard, and (3) a 230kV interconnection line in Maricopa County. The project will provide transmission interconnection for the Panda Gila River generating station to the Western Systems Coordinating Council transmission grid.

Cite this Record

West of the Maricopa Mountains: A Cultural Resources Inventory in Support of the Proposed Gila River Transmission Project. J. Simon Bruder, Cara Lonardo, A.E. (Gene) Rogge. 2001 ( tDAR id: 475227) ; doi:10.48512/XCV8475227

This Resource is Part of the Following Collections

Individual & Institutional Roles

Contact(s): Daniel Garcia

Prepared By(s): Urs Corporation

Submitted To(s): Arizona Public Service Company; Bureau of Land Management; Arizona State Land Department

Record Identifiers

URS Cultural Resource Report No.(s): 2001-6(AZ)

State Right-of-Way Application No.(s): 14-105674

File Information

  Name Size Creation Date Date Uploaded Access
Bruder2001West-of-the-Maricopa-Mountains.pdf 6.42mb Apr 5, 2023 2:03:18 PM Confidential

Accessing Restricted Files

At least one of the files for this resource is restricted from public view. For more information regarding access to these files, please reference the contact information below

Contact(s): Daniel Garcia