Archaeological Survey of the Butterfield Stage Overland Route, Gila Bend to Mobile, Maricopa County, Arizona (1995)
DOCUMENT Full-Text Mark R. Hackbarth.

A pedestrian Class III archaeological survey of a 50 m corridor along 23 mi. (37 km) of an alignment known as the Butterfield Stage Overland Route. The survey recorded six archaeological sites and 83 isolated occurrences of prehistoric artifacts. Materials relating to the use of the route as a historic travel corridor dominated the travel corridor site. Artifacts associated with prehistoric land uses were also identified.


Cultural Resources Survey for the SRP Palo Verde to Pinal West 500 kV Transmission Lines, Maricopa and Pinal Counties, Arizona (2007)
DOCUMENT Full-Text Tiffany C. Clark. T. Kathleen Henderson.

This report presents the results of Class III cultural resources surveys conducted for the Palo Verde to Pinal West Transmission Line Project. The work was sponsored by Salt River Project (SRP) in support of two proposed 500 kV transmission lines that will connect the existing Hassayampa Switchyard, west of Phoenix, Maricopa County, Arizona, and the proposed Pinal West Substation, western Pinal County, Arizona. The cultural resources studies described here include three previous archaeological...


Treatment and Data Recovery Plan for the SRP Palo Verde to Pinal West 500 kV Transmission Line, Maricopa and Pinal Counties, Arizona (2007)
DOCUMENT Full-Text T. Kathleen Henderson.

Salt River Project Agricultural  Improvement and  Power District  (SRP)  plans  to construct a new  500  kV  transmission  line  between  the  existing  Hassayampa  Switchyard,  west  of Phoenix, Maricopa County, Arizona, and the proposed Pinal West Substation, western Pinal County, Arizona (Figure 1). Designated the Palo Verde to Pinal West (PV-PW) transmission line,  this  powerline  is  the  first  of two  that SRP  plans  to  eventually  construct between  the Hassayampa  Switchyard  and...


West of the Maricopa Mountains: A Cultural Resources Inventory in Support of the Proposed Gila River Transmission Project (2001)
DOCUMENT Full-Text J. Simon Bruder. Cara Lonardo. A.E. (Gene) Rogge.

APS proposes to construct (1) two parallel 500 kilovolt (kV) transmission lines within a 450-foot-wide right-of-way, (2) an 80-acre 500kV switchyard, and (3) a 230kV interconnection line in Maricopa County. The project will provide transmission interconnection for the Panda Gila River generating station to the Western Systems Coordinating Council transmission grid.