Gila Bend Canal (Site Name Keyword)

1-5 (5 Records)

Archaeology at the Gillespie Dam Site: Data Recovery Investigations for the Palo Verde to Pinal West 500 kV Transmission Line, Maricopa County, Arizona (2011)
DOCUMENT Full-Text Uploaded by: Alaina Harmon

In this report, the results of data recovery efforts conducted for the Palo Verde to Pinal West transmission line project at the Gillespie Dam site, AZ T:13:18 (ASM), in the Gila Bend area of the Gila River are presented. The site is a prehistoric Hohokam-Patayan settlement with an overlay of Historic era material. Fieldwork primarily occurred within the construction staging area of a transmission tower. Although covering less than an acre, the staging area contained surprising numbers of...


Cultural Resources Survey for the SRP Palo Verde to Pinal West 500 kV Transmission Lines, Maricopa and Pinal Counties, Arizona (2007)
DOCUMENT Full-Text Tiffany C. Clark. T. Kathleen Henderson.

This report presents the results of Class III cultural resources surveys conducted for the Palo Verde to Pinal West Transmission Line Project. The work was sponsored by Salt River Project (SRP) in support of two proposed 500 kV transmission lines that will connect the existing Hassayampa Switchyard, west of Phoenix, Maricopa County, Arizona, and the proposed Pinal West Substation, western Pinal County, Arizona. The cultural resources studies described here include three previous archaeological...


A Cultural Resources Survey of the Proposed Hassayampa-Jojoba Transmission Line, Maricopa County, Arizona (2002)
DOCUMENT Full-Text Regina L. Chapin-Pyritz. Matthew Hill, Jr..

GBPP (Gila Bend Power Partners) proposes to construct and operate a 500kV transmission line, which will deliver electrical power from the Hassayampa Switchyard south of Wintersburg, Arizona to the Jojoba Switchyard currently under construction in south-central Maricopa County, Arizona. The project will increase the transmission of electrical power into areas surrounding metropolitan Phoenix, and will promote economic development of benefit to the people of Arizona. GBPP retained EPG...


Treatment and Data Recovery Plan for the SRP Palo Verde to Pinal West 500 kV Transmission Line, Maricopa and Pinal Counties, Arizona (2007)
DOCUMENT Full-Text T. Kathleen Henderson.

Salt River Project Agricultural  Improvement and  Power District  (SRP)  plans  to construct a new  500  kV  transmission  line  between  the  existing  Hassayampa  Switchyard,  west  of Phoenix, Maricopa County, Arizona, and the proposed Pinal West Substation, western Pinal County, Arizona (Figure 1). Designated the Palo Verde to Pinal West (PV-PW) transmission line,  this  powerline  is  the  first  of two  that SRP  plans  to  eventually  construct between  the Hassayampa  Switchyard  and...


West of the Maricopa Mountains: A Cultural Resources Inventory in Support of the Proposed Gila River Transmission Project (2001)
DOCUMENT Full-Text J. Simon Bruder. Cara Lonardo. A.E. (Gene) Rogge.

APS proposes to construct (1) two parallel 500 kilovolt (kV) transmission lines within a 450-foot-wide right-of-way, (2) an 80-acre 500kV switchyard, and (3) a 230kV interconnection line in Maricopa County. The project will provide transmission interconnection for the Panda Gila River generating station to the Western Systems Coordinating Council transmission grid.