Navajo Indian Reservation (Geographic Keyword)
1-21 (21 Records)
The subject of this report is the description of the site and environs of a proposed short transmission line corridor that will tie the San Juan Generating Station to existing lines to Albuquerque for delivery of power to that city and to the Four Corners plant thereby providing transmission line backup for Albuquerque and Tucson and improving stability of the electrical system. The requirements for such a report as this come from the National Environmental Policy Act through its...
Archaeological Monitoring of Four Well Field Sites on Navajo Nation and Hopi Tribe Lands Near Leupp, Navajo County, Arizona
The Bureau of Reclamation (Reclamation) investigated a potential well field southwest of the community of Leupp on the Navajo Nation, and north of Meteor Crater on Hopi Tribal lands. Five well sites were originally identified to assess the overall potential for developing a well field to pump ground water for delivery by pipeline to the Peabody Coal Mine as well as to Hopi and Navajo communities. Under an on-call contract with Reclamation, at the request of Jon Czaplicki, Archaeological...
Archaeological Monitoring of Four Well Field Sites on Navajo Nation and Hopi Tribe Lands Near Leupp, Navajo County, Arizona: Photo Log (2005)
The Bureau of Reclamation (Reclamation) investigated a potential well field southwest of the community of Leupp on the Navajo Nation, and north of Meteor Crater on Hopi Tribal lands. Five well sites were originally identified to assess the overall potential for developing a well field to pump ground water for delivery by pipeline to the Peabody Coal Mine as well as to Hopi and Navajo communities. Under an on-call contract with Reclamation, at the request of Jon Czaplicki, Archaeological...
Archaeological Monitoring of Four Well Field Sites on Navajo Nation and Hopi Tribe Lands Near Leupp, Navajo County, Arizona: Photos (2005)
The Bureau of Reclamation (Reclamation) investigated a potential well field southwest of the community of Leupp on the Navajo Nation, and north of Meteor Crater on Hopi Tribal lands. Five well sites were originally identified to assess the overall potential for developing a well field to pump ground water for delivery by pipeline to the Peabody Coal Mine as well as to Hopi and Navajo communities. Under an on-call contract with Reclamation, at the request of Jon Czaplicki, Archaeological...
Archaeological Monitoring of Four Well Field Sites on Navajo Nation and Hopi Tribe Lands Near Leupp, Navajo County, Arizona: Report (2004)
The Bureau of Reclamation (Reclamation) investigated a potential well field southwest of the community of Leupp on the Navajo Nation, and north of Meteor Crater on Hopi Tribal lands. Five well sites were originally identified to assess the overall potential for developing a well field to pump ground water for delivery by pipeline to the Peabody Coal Mine as well as to Hopi and Navajo communities. Under an on-call contract with Reclamation, at the request of Jon Czaplicki, Archaeological...
Black Mesa: Archaeological Investigations on Black Mesa, the 1969-1970 Seasons (1972)
Black Mesa is large elevated land mass which comprises a part of the Navajo and Hopi Indian reservations in the northeast corner of Arizona. This report is the second volume in a series devoted to the archaeology of the region by the Prescott College Archaeological Field School. It is mainly a descriptive account of the survey of 193 Anasazi, Navajo, and Anglo sites and the excavation of nine of the Kayenta Anasazi villages.
Class III (Intensive) Cultural Resources Survey of Five Well Sites on Navajo Nation and Hopi Tribe Lands, Near Leupp, Navajo County, Arizona
The U.S. Bureau of Reclamation (Reclamation) investigated a potential well field southwest of the community of Leupp on the Navajo Nation, and north of Meteor Crater on Hopi Tribal lands. Five well sites had been identified to assess the overall potential for developing a well field to pump ground water for delivery by pipeline to the Peabody Coal Mine as well as to Hopi and Navajo communities. Each of the well site parcels was approximately 100 acres, for a total project area of approximately...
Class III (Intensive) Cultural Resources Survey of Five Well Sites on Navajo Nation and Hopi Tribe Lands, Near Leupp, Navajo County, Arizona: Photo Log (2004)
The U.S. Bureau of Reclamation (Reclamation) investigated a potential well field southwest of the community of Leupp on the Navajo Nation, and north of Meteor Crater on Hopi Tribal lands. Five well sites had been identified to assess the overall potential for developing a well field to pump ground water for delivery by pipeline to the Peabody Coal Mine as well as to Hopi and Navajo communities. Each of the well site parcels was approximately 100 acres, for a total project area of approximately...
Class III (Intensive) Cultural Resources Survey of Five Well Sites on Navajo Nation and Hopi Tribe Lands, Near Leupp, Navajo County, Arizona: Photos (2004)
The U.S. Bureau of Reclamation (Reclamation) investigated a potential well field southwest of the community of Leupp on the Navajo Nation, and north of Meteor Crater on Hopi Tribal lands. Five well sites had been identified to assess the overall potential for developing a well field to pump ground water for delivery by pipeline to the Peabody Coal Mine as well as to Hopi and Navajo communities. Each of the well site parcels was approximately 100 acres, for a total project area of approximately...
Class III (Intensive) Cultural Resources Survey of Five Well Sites on Navajo Nation and Hopi Tribe Lands, Near Leupp, Navajo County, Arizona: Report (2004)
The U.S. Bureau of Reclamation (Reclamation) investigated a potential well field southwest of the community of Leupp on the Navajo Nation, and north of Meteor Crater on Hopi Tribal lands. Five well sites had been identified to assess the overall potential for developing a well field to pump ground water for delivery by pipeline to the Peabody Coal Mine as well as to Hopi and Navajo communities. Each of the well site parcels was approximately 100 acres, for a total project area of approximately...
A Cultural Resources Survey for Proposed Road Improvements Along State Route 98 South of the Navajo Generating Station on the Navajo Indian Reservation near Page, Arizona (1994)
On April 29, 1994, Lynn Neal of SWCA, Inc., Environmental Consultants conducted an archaeological survey of 25.6 acres (10.4 ha) along State Route 98 near Page, Arizona, at the request of Dr. Judy Brunson-Hadley, SRP Archaeologist. SRP is the contact and funding agency. No cultural resources were identified.
Cultural Resources Survey of the Ganado Irrigation System and 40 Farm Plots, Navajo Indian Reservation, Arizona
The Bureau of Reclamation (Reclamation) and Navajo Nation Department of Water Resources (NNDWR), in conjunction with other Federal and local entities prepared and evaluated alternatives for improving water management, conservation, and distribution within the Ganado Irrigation System. The resulting recommendations are termed the Ganado Irrigation Water Conservation Project (GIWCP), whose purpose is to develop a system that will enable the efficient conveyance of irrigation water to farmland and...
Cultural Resources Survey of the Ganado Irrigation System and 40 Farm Plots, Navajo Indian Reservation, Arizona: Photos (2000)
The Bureau of Reclamation (Reclamation) and Navajo Nation Department of Water Resources (NNDWR), in conjunction with other Federal and local entities prepared and evaluated alternatives for improving water management, conservation, and distribution within the Ganado Irrigation System. The resulting recommendations are termed the Ganado Irrigation Water Conservation Project (GIWCP), whose purpose is to develop a system that will enable the efficient conveyance of irrigation water to farmland and...
Cultural Resources Survey of the Ganado Irrigation System and 40 Farm Plots, Navajo Indian Reservation, Arizona: Report (2001)
The Bureau of Reclamation (Reclamation) and Navajo Nation Department of Water Resources (NNDWR), in conjunction with other Federal and local entities prepared and evaluated alternatives for improving water management, conservation, and distribution within the Ganado Irrigation System. The resulting recommendations are termed the Ganado Irrigation Water Conservation Project (GIWCP), whose purpose is to develop a system that will enable the efficient conveyance of irrigation water to farmland and...
An Environmental Statement of A Proposal to Construct Two 500 kV Powerlines Across National Forest Land by the Arizona Public Service Company (1971)
Arizona Public Service Company, a member of the Western Energy Supply and Transmission Associates (WEST), is responsible for the construction and maintenance of two 500,000 volt transmission lines from the Navajo generating plant (now being constructed 4 miles east of Page, Arizona) to Phoenix, Arizona. The Company submitted a proposed right-of-way location for the transmission line route to the Forest Service for study and review. Upon receipt of this proposal Southwestern Regional Forester...
The Ganado Irrigation System Canal and Irrigation Features: A Description, History, and Finders’ Guide
The Bureau of Reclamation (Reclamation) and Navajo Nation Department of Water Resources (NNDWR), in conjunction with other Federal and local entities prepared and evaluated alternatives for improving water management, conservation, and distribution within the Ganado Irrigation System. The resulting recommendations are termed the Ganado Irrigation Water Conservation Project (GIWCP), whose purpose is to develop a system that will enable the efficient conveyance of irrigation water to farmland and...
The Ganado Irrigation System Canal and Irrigation Features: A Description, History, and Finders’ Guide: Photos (2001)
The Bureau of Reclamation (Reclamation) and Navajo Nation Department of Water Resources (NNDWR), in conjunction with other Federal and local entities prepared and evaluated alternatives for improving water management, conservation, and distribution within the Ganado Irrigation System. The resulting recommendations are termed the Ganado Irrigation Water Conservation Project (GIWCP), whose purpose is to develop a system that will enable the efficient conveyance of irrigation water to farmland and...
The Ganado Irrigation System Canal and Irrigation Features: A Description, History, and Finders’ Guide: Report (2002)
The Bureau of Reclamation (Reclamation) and Navajo Nation Department of Water Resources (NNDWR), in conjunction with other Federal and local entities prepared and evaluated alternatives for improving water management, conservation, and distribution within the Ganado Irrigation System. The resulting recommendations are termed the Ganado Irrigation Water Conservation Project (GIWCP), whose purpose is to develop a system that will enable the efficient conveyance of irrigation water to farmland and...
Historic Navajo Studies in Northeastern Arizona (1976)
Archaeological excavations along the north rim of Canyon del Muerto, Canyon de Chelly National Monument, Arizona, were conducted during 1972 by the Museum of Northern Arizona. The preliminary objective was to salvage 28 archaeological sites located within the rights-of-way of Route N64, the Chinle to Tsaile Lake road, and four associated spur roads. Research designs for the excavations are broken into historic Navajo and prehistoric Anasazi sites; this report is concerned with the former. This...
Poster: U.S. Bureau of Reclamation's Farm Rehabilitation Project Collaborations with the Navajo and Tohono O'odham Tribes in Arizona, as Implemented by Archaeological Consulting Services (2010)
Reclamation projects have involved collaborative efforts with two of Arizona’s largest Native American groups, the Navajo Nation and the Tohono O’odham Nation. Both involved construction of infrastructure to support traditional and cooperative farming. The Navajo Nation project involved the creation of an award-winning DVD of Navajo elders discussing traditional irrigation farming at Ganado, and the Tohono O’odham Nation project involved extensive testing prior to construction of new irrigation...
Technical Appendices: Ambrosia-Coronado 230kV Transmission Project Alternatives Evaluation and Macro Corridor Analysis (1991)
This document describes the study methods and results of the regional environmental baseline studies conducted for the Ambrosia-Coronado 230kV Transmission Project between November 1989 and March 1990. The focus of the regional data collection effort was to identify environmental resources and features that would assist in developing locations for alternative transmission line corridors within the defined study area. The purpose of this section is to describe the regional scale visual resources...