Vineyard Road Retarding Dam (Geographic Keyword)
1-2 (2 Records)
In 1978, the Bureau of Reclamation (Reclamation) directed the Museum of Northern Arizona (MNA) to complete an intensive archaeological survey of the proposed alignment for the Salt-Gila Aqueduct, a feature of the Central Arizona Project. The survey area was 11,115 acres and included the 60 mile-long transmission line (with a typical width of 200 meters), three proposed utility line locations, one flood retention dike location, 11 possible spoil or realignment areas, and a subsidence well....
A Cultural Inventory of the Proposed Granite Reef and Salt-Gila Aqueducts, Agua Fria River to Gila River, Arizona (1969)
One of several construction programs proposed for inclusion in the Central Arizona Project was a system of aqueducts to link Parker Dam on the Colorado River in western Arizona and the Charleston Damsite on the San Pedro River in southeastern Arizona. Since the possibility existed that archaeological remains might be destroyed by necessary subjugation of lands for the aqueduct, the Southwest Archaeological Center of the National Park Service, U. S. Department of the Interior, made arrangements...