Enterprise Canal (Geographic Keyword)
1-4 (4 Records)
At the request of Salt River Project, the Museum of Northern Arizona conducted an archaeological survey of a proposed 500kV transmission line between the Palo Verde Nuclear Generating Station (near Wintersburg, Arizona) and the Kyrene Substation (near Tempe, Arizona). During survey of the 73.3 mi right-of-way, evidences of historic and prehistoric activity were recorded at 10 sites and 43 loci of isolated artifacts or features. With few exceptions, all identified remains could be assigned to the...
An Archaeological Survey of Two Arizona River Crossings Along the All-American Pipeline (1984)
Archaeological Consulting Services (ACS) conducted an archaeological survey of two major Arizona river crossings along the proposed route of the All-American Pipeline at the request of Dr. Ed Weil, Cultural Resources Manager, Applied Conservation Technology (ACT). ACT is coordinating the entire cultural resource effort along this proposed pipeline from the Gulf of Mexico to the Pacific Ocean and has subcontracted with ACS to undertake the Arizona portion of the route. Because the placement of...
An Archaeological Survey of Two Staging Areas and a Portion of Two Parallel El Paso Natural Gas Company Pipelines Near Gillespie Dam on the Gila River, Maricopa County, Arizona (1991)
Archaeological Consulting Services, Ltd. (ACS) conducted a cultural resource survey of two segments of El Paso Natural Gas Company (EPNG) pipelines to be rerouted across the Gila River below Gillespie Dam. For reasons of safety, EPNG intends to bury the two lines that currently cross the river as bridges. In addition, two proposed staging areas for storage of pipe and equipment during the construction of the rerouted pipelines were also surveyed. The project was conducted at the request of Dr....
Cultural Resource Survey of State and BLM Lands for the Proposed Palo Verde-Pinal West Project, Maricopa and Pinal Counties, Arizona, Draft Report (2003)
Salt River Project Agricultural Improvement and Power District (SRP) proposes to construct and operate the 56-mile-long Palo Verde-Pinal West 500 kilovolt (kV) transmission line, which will deliver power from the Hassayampa Switchyard south of Wintersberg to the proposed Pinal West Substation in northwestern Pinal County about 24 miles south of Phoenix, in order to provide additional transmission capacity to support future growth in Maricopa, Pinal, and Pima counties. The SRI survey, conducted...