Salt River Project Agricultural Improvement and Power District (SRP) proposes to construct and operate the 56-mile-long Palo Verde-Pinal West 500 kilovolt (kV) transmission line, which will deliver power from the Hassayampa Switchyard south of Wintersberg to the proposed Pinal West Substation in northwestern Pinal County about 24 miles south of Phoenix, in order to provide additional transmission capacity to support future growth in Maricopa, Pinal, and Pima counties.

The SRI survey, conducted between April 15 and 25, 2003 and again on May 7, 2003, examined a total of 1,248 acres. The SRI survey included (1) a discontinuous 22-mile-long (35.5-km-long) corridor along the proposed SRP transmission line right-of-way ranging in width from 200 to 1000-feet-wide (60-300-m-wide), (2) a block survey area immediate north of the transmission line corridor measuring 2,400 by 1,300 feet (731 by 396 m) , and (3) a 0.8-mile-long (1.3-km-long), 200-feet-wide (60-m-wide) alternative transmission line corridor.

Includes both draft report and original copy with reviewer comments.

Cite this Record

Cultural Resource Survey of State and BLM Lands for the Proposed Palo Verde-Pinal West Project, Maricopa and Pinal Counties, Arizona, Draft Report, 40. Matthew Hill, Kimberly R. Kennedy, Edgar K. Huber. 2003 ( tDAR id: 408206) ; doi:10.6067/XCV8408206

This Resource is Part of the Following Collections

Spatial Coverage

min long: -112.665; min lat: 33.119 ; max long: -112.159; max lat: 33.505 ;

Record Identifiers

Technical Report No.(s): 03-40

Salt River Project Library Call No.(s): E78.P35H55 2003

Salt River Project Library Barcode No.(s): 00091045

BLM Case File No.(s): AZA-32057

File Information

  Name Size Creation Date Date Uploaded Access
2003_HillKennedyHuber_CulturalResourceBLM_OCR_PDFA.pdf 51.14mb Mar 24, 2017 2:00:29 PM Confidential
This file is unredacted.
2003_HillKennedyHuber_CulturalResourceBLMAnnotated_OCR_PDFA.pdf 49.64mb Mar 24, 2017 2:05:17 PM Confidential
This file is unredacted. Annotated version of draft report.

Accessing Restricted Files

At least one of the files for this resource is restricted from public view. For more information regarding access to these files, please reference the contact information below

Contact(s): Salt River Project Cultural Resource Manager