Cultural Resource Survey of State and BLM Lands for the Proposed Palo Verde-Pinal West Project, Maricopa and Pinal Counties, Arizona, Draft Report
Author(s): Matthew Hill; Kimberly R. Kennedy; Edgar K. Huber
Year: 2003
Summary
Salt River Project Agricultural Improvement and Power District (SRP) proposes to construct and operate the 56-mile-long Palo Verde-Pinal West 500 kilovolt (kV) transmission line, which will deliver power from the Hassayampa Switchyard south of Wintersberg to the proposed Pinal West Substation in northwestern Pinal County about 24 miles south of Phoenix, in order to provide additional transmission capacity to support future growth in Maricopa, Pinal, and Pima counties.
The SRI survey, conducted between April 15 and 25, 2003 and again on May 7, 2003, examined a total of 1,248 acres. The SRI survey included (1) a discontinuous 22-mile-long (35.5-km-long) corridor along the proposed SRP transmission line right-of-way ranging in width from 200 to 1000-feet-wide (60-300-m-wide), (2) a block survey area immediate north of the transmission line corridor measuring 2,400 by 1,300 feet (731 by 396 m) , and (3) a 0.8-mile-long (1.3-km-long), 200-feet-wide (60-m-wide) alternative transmission line corridor.
Includes both draft report and original copy with reviewer comments.
Cite this Record
Cultural Resource Survey of State and BLM Lands for the Proposed Palo Verde-Pinal West Project, Maricopa and Pinal Counties, Arizona, Draft Report, 40. Matthew Hill, Kimberly R. Kennedy, Edgar K. Huber. 2003 ( tDAR id: 408206) ; doi:10.6067/XCV8408206
Keywords
Culture
Historic
•
Prehistoric
Site Name
AZ T:14:137(ASM)
•
AZ T:15:35(ASM)
•
AZ T:15:36(ASM)
•
AZ T:15:37(ASM)
•
AZ T:15:7(ASM)
•
AZ T:15:9(ASM)
•
AZ T:16:149(ASM)
Investigation Types
Reconnaissance / Survey
Geographic Keywords
Buckeye Hills
•
Enterprise Canal
•
Gila Bend Canal
•
Gila River
•
Hassayampa Substation
•
Jojoba Switchyard
•
Maricopa County
•
Pinal County
•
Pinal West Substation
Spatial Coverage
min long: -112.665; min lat: 33.119 ; max long: -112.159; max lat: 33.505 ;
Individual & Institutional Roles
Contact(s): Salt River Project Cultural Resource Manager
Contributor(s): Kimberly R. Kennedy
Principal Investigator(s): Edgar K. Huber
Project Director(s): Mathew Hill
Repository(s): Salt River Project, Tempe, AZ
Prepared By(s): Statistical Research, Inc.; Greystone Environmental Consultants Inc.; Salt River Project Agricultural Improvement and Power District
Submitted To(s): Bureau of Land Management; Arizona State Land Department; Arizona Power Plant and Transmission Line Siting Committee; Arizona Corporation Committee
Record Identifiers
Technical Report No.(s): 03-40
Salt River Project Library Call No.(s): E78.P35H55 2003
Salt River Project Library Barcode No.(s): 00091045
BLM Case File No.(s): AZA-32057
File Information
Name | Size | Creation Date | Date Uploaded | Access | |
---|---|---|---|---|---|
2003_HillKennedyHuber_CulturalResourceBLM_OCR_PDFA.pdf | 51.14mb | Mar 24, 2017 2:00:29 PM | Confidential | ||
This file is unredacted. | |||||
2003_HillKennedyHuber_CulturalResourceBLMAnnotated_OCR_PDFA.pdf | 49.64mb | Mar 24, 2017 2:05:17 PM | Confidential | ||
This file is unredacted. Annotated version of draft report. |
Accessing Restricted Files
At least one of the files for this resource is restricted from public view. For more information regarding access to these files, please reference the contact information below
Contact(s): Salt River Project Cultural Resource Manager