Baseline (Geographic Keyword)
1-3 (3 Records)
Northland Research, Inc. (Northland) has completed an archaeological survey of 98.0 acres (39.7 hectares) in Maricopa County, Arizona for Salt River Project and Arizona Public Service. The work accomplished included an archaeological survey, review of pertinent archaeological literature, and an examination of historical records. Northland’s survey was conducted between May 25 to June 4, 2001 and July 22, 2001 under authority of its Arizona State Museum permit #2001 -33bl. Mark Hackbarth served...
Results of Phase I (Limited) Data Recovery at AZ T:12:116(ASM) for Proposed Improvements Along 43rd Avenue at the Roosevelt Irrigation District Canal, Southwest Phoenix, Maricopa County, Arizona (2004)
The City of Phoenix (COP) is planning to build a new bridge structure at the crossing of 43rd Avenue and the Roosevelt Canal, widen the 43rd Avenue alignment, and relocate a Salt River Project (SRP) irrigation canal and two utility lines attached to the existing bridge structure. The project is eligible for Federal aid funding by the Federal Highway Administration (FHWA) and is considered an undertaking subject to Section 106 review. Significant cultural resources have been previously identified...
Testing and Data Recovery Measures Performed at Five Prehistoric Sites along Siphon Draw, Pinal County, Arizona (1990)
Archaeological Consulting Services, Ltd. (ACS) conducted archaeological testing and data recovery measures on five prehistoric sites near Apache Junction at the request of Mr. Kurt Kefgen of TRW/Mesa Safety Systems (TRW). The work was performed under an excavation permit issued by Arizona State Museum (ASM) in order to recover all significant information from these sites prior to the development of the state land by TRW. The five sites are located in Sections 7 and 18 of Township 1 South, Range...