Arizona Public Service Company, Pinnacle Peak to Ocotillo 230 kV Project, Assessment of Cultural Resources (1984)
DOCUMENT Full-Text Richard W. Effland. Margerie Green.

Arizona Public Service Company (APS) proposes to rebuild an existing 230 kV transmission line which connects the Pinnacle Peak and Ocotillo substations. The portion of the line which currently lies within the Salt River channel north of Mesa and south of the Salt River Pima-Maricopa Indian Community (SRPMIC) needs to be relocated due to the extensive damage caused by severe flooding over the past ten years. APS proposes to move the right-of-way out of the channel and onto the north terrace...


Cultural Resource Survey of the Proposed Beeline Substation Addition, Scottsdale, Arizona (1989)
DOCUMENT Full-Text RECON-Regional Environmental Consultants.

On December 28, 1988, RECON conducted an archaeological survey on the proposed Beeline Substation Addition in Scottsdale, Arizona. The proposed substation is located north of the existing Beeline Substation on the northwest corner of Hayden Road and Oak Street. Prior to the survey, an archaeological background file search was conducted at the State Historic Preservation Office, Arizona State Parks and Recreation Department, Phoenix, Arizona, Pueblo Grande Museum, Phoenix, Arizona, and the...


Historic Pima Occupation and Land Use on the Mesa Terrace of the Salt River Valley, Arizona: Introduction to the Beeline Highway Archaeological Project (1987)
DOCUMENT Full-Text Scott L. Fedick.

The Salt River Project (SRP) and Arizona Public Service Company (APS) propose to construct three transmission lines along a portion of the Beeline Highway on the Salt River Pima-Maricopa Indian Community (SRPMIC). SRP proposed to build a new line which connects the Pinnacle Peak, Brandow, and Papago Buttes substations. At the same time, APS proposed to realign two existing transmission lines and move them out of the Salt River channel and onto the north terrace above the river. Archaeological...


Salt River Project Pinnacle Peak to Papago Buttes Project, Assessment of Cultural Resources (1985)
DOCUMENT Full-Text Richard W. Effland.

Salt River Project (SRP) proposes to construct a 230 kV transmission line to connect the Pinnacle Peak, Brandow, and Papago Buttes substations. Archaeological Consulting Services (ACS) was contracted to perform an assessment of impacts to cultural resources that would be caused by the project. ACS is responsible for assessing potential impacts to historical and archaeological sites as well as architectural resources in the vicinity of the new right-of -way. One hundred percent survey of the...