Mazatal Mountains (Geographic Keyword)
1-4 (4 Records)
This is a final, summary report on historic cultural resources in relation to the Central Arizona Water Control Study (CAWCS). The objectives of the CAWCS were to identify and evaluate alternative measures for flood control and regulatory water storage in Central Arizona in conjunction with construction of the Central Arizona Project. Having considered numerous alternative plans to meet these objectives, the Bureau of Reclamation defined a preferred alternative (Plan...
General Sketch Map of Salt River Project, Arizona (1903)
1903 general sketch map of Salt River Project from the Third Annual Report Reclamation Service Pl. II Depicts the Roosevelt Dam and Vicinity with the locations of the steam power plant and shop, brick yard, bunk house, clay bins, camping grounds, mess tent, hospital, oil basin, limestone quarry, cement mill, line kiln, site of contractors camp, cottage's office.
Tonto Creek Archaeological Project, Archaeological Investigations along Tonto Creek, Volume 1: Introduction and Site Descriptions for the Sycamore Creek and Slate Creek Sections (2000)
The Tonto Creek Archaeological Project (TCAP) area was located in the Tonto Basin of east-central Arizona. The project, funded by the Arizona Department of Transportation (ADOT) was undertaken by Desert Archaeology in advance of the 1994-1996 realignment of Arizona State Route 188. The area available for investigation was a 61-m-wide (200-ft) corridor centered on the planned route for the realigned highway. The corridor followed a 13.3-km (8-mi) stretch of the western terrace overlooking Tonto...
Tonto Creek Archaeological Project, Archaeological Investigations along Tonto Creek, Volume 2: Site Descriptions for the Punkin Center Section (2000)
The Tonto Creek Archaeological Project (TCAP) area was located in the Tonto Basin of east-central Arizona. The project, funded by the Arizona Department of Transportation (ADOT) was undertaken by Desert Archaeology in advance of the 1994-1996 realignment of Arizona State Route 188. The area available for investigation was a 61-m-wide (200-ft) corridor centered on the planned route for the realigned highway. The corridor followed a 13.3-km (8-mi) stretch of the western terrace overlooking Tonto...