JBSA-Sam Houston (Geographic Keyword)

301-325 (726 Records)

OAHP Historic Structure Inventory, Building 619-Building 1198, Fort Sam Houston, Texas (1980)
DOCUMENT Full-Text Sally Kress Tompkins.

A group of historic structure inventory forms and photographs for Fort Sam Houston, Joint Base San Antonio, Texas. Types of buildings with inventory forms and accompanying photographs include: officers' quarters, commanding officers' quarters, non-commissioned officers' quarters, enlisted mens' barracks, band barracks, administration buildings, latrines, branch exchange, vehicle shed, Fort Sam Houston playhouse, gymnasium, regimental brigade headquarters building, detached day rooms,...


OAHP Historic Structure Inventory, Cemetery and Building 1-Building T50, Fort Sam Houston, Texas (1980)
DOCUMENT Full-Text Sally Kress Tompkins.

A group of historic structure inventory forms and photographs for Fort Sam Houston, Joint Base San Antonio, Texas. Types of buildings with inventory forms and accompanying photographs include: a pet cemetery, grave sites, gates at Grayson Street, film vault and workshop, tents, post headquarters building, officers' quarters, garages, storage and storerooms, warehouses, terminal equipment building, bandstand, snack bar, blue print room, army headquarters building, Pershing house, San Antonio...


OAHP Historic Structure Inventory, Fort Sam Houston Landmark District and Camp Bullis, Texas (1980)
DOCUMENT Full-Text Sally Kress Tompkins.

A group of historic structure inventory forms and photographs for Fort Sam Houston, Joint Base San Antonio, Texas. These are general information cards regarding the inventory project.


OAHP Historic Structure Inventory, Missing Information, Fort Sam Houston, Texas (1980)
DOCUMENT Full-Text Uploaded by: Mark Sloop

A group of historic structure inventory forms and photographs for Fort Sam Houston, Joint Base San Antonio, Texas. Missing photos or information sheets.


Outline for the Study of Architecture at Fort Sam Houston, Maps and Drawings (2010)
DOCUMENT Full-Text Uploaded by: Chelsea Walter

This pamphlet is provided as a study guide for the architecture at Fort Sam Houston, Texas. Fort Sam Houston was first established in 1845 in San Antonio and moved to present location during 1870-76. Five traditional missions include Headquarters, Garrison, Logistics, Mobilization/training, Medical. Now about 3000 acres, post includes more than 800 historic buildings & structures (nine times as many as at Colonial Williamsburg). Historic preservation and adaptive re-use are key concepts. All...


Outline for the Study of Architecture at Fort Sam Houston, Photographs (2010)
DOCUMENT Full-Text Uploaded by: Chelsea Walter

Historic photographs of architecture at Fort Sam Houston, Texas. Specific buildings of interest include the Quadrangle and Staff Post, Upper Post, Infantry Post, Dodd Field, the Cavalry and Light Artillery Post Addition, Camp Travis, the New Post, and Wherry Housing.


Phase I Existing Conditions Assessment of Building 1026, Fort Sam Houston, Texas (2009)
DOCUMENT Full-Text Uploaded by: Chelsea Walter

This Existing Conditions Assessment (ECA) project was contracted by the U.S. Army Corps of Engineers (USACE), Fort Worth District, under Contract W9126G-06-D-0400, Task Order 008, in support of Fort Sam Houston (FSH) and Camp Bullis (CB). This ECA report was prepared to support the Army Alternate Procedures (AAP) Historic Properties Component (HPC) of the Integrated Cultural Resources Management Plan for historic buildings and Army Regulations for building reduction. The HPC has standard...


Phase I Existing Conditions Assessment of Building 1281, Fort Sam Houston, Texas (2009)
DOCUMENT Full-Text Uploaded by: Chelsea Walter

This Existing Conditions Assessment (ECA) project was contracted by the U.S. Army Corps of Engineers (USACE), Fort Worth District, under Contract W9126G-06-D-0400, Task Order 008, in support of Fort Sam Houston (FSH) and Camp Bullis (CB). This ECA report was prepared to support Army Alternate Procedures (AAP) Historic Properties Component (HPC) of the Integrated Cultural Resources Management Plan for historic buildings and Army Regulations for building reduction. The HPC has standard operating...


Phase I Existing Conditions Assessment of Building 189, Fort Sam Houston, Texas (2009)
DOCUMENT Full-Text Uploaded by: Chelsea Walter

This Existing Conditions Assessment (ECA) project was contracted by the U.S. Army Corps of Engineers (USACE), Fort Worth District, under Contract W9126G-06-D-0400, Task Order 008, in support of Fort Sam Houston (FSH) and Camp Bullis (CB). This ECA report was prepared to support the Army Alternate Procedures (AAP) Historic Properties Component (HPC) of the Integrated Cultural Resources Management Plan for historic buildings and Army Regulations for building reduction. The HPC has standard...


Phase I Existing Conditions Assessment of Building 197, Fort Sam Houston, Texas (2009)
DOCUMENT Full-Text Uploaded by: Chelsea Walter

This Existing Conditions Assessment (ECA) project was contracted by the U.S. Army Corps of Engineers (USACE), Fort Worth District, under Contract W9126G-06-D-0400, Task Order 008, in support of Fort Sam Houston (FSH) and Camp Bullis (CB). This ECA report was prepared to support the Army Alternate Procedures (AAP) Historic Properties Component (HPC) of the Integrated Cultural Resources Management Plan for historic buildings and Army Regulations for building reduction. The HPC has standard...


Phase I Existing Conditions Assessment of Building 198, Fort Sam Houston, Texas (2009)
DOCUMENT Full-Text Uploaded by: Chelsea Walter

This Existing Conditions Assessment (ECA) project was contracted by the U.S. Army Corps of Engineers (USACE), Fort Worth District, under Contract W9126G-06-D-0400, Task Order 008, in support of Fort Sam Houston (FSH) and Camp Bullis (CB). This ECA report was prepared to support the Army Alternate Procedures (AAP) Historic Properties Component (HPC) of the Integrated Cultural Resources Management Plan for historic buildings and Army Regulations for building reduction. The HPC has standard...


Phase I Existing Conditions Assessment of Building 199, Fort Sam Houston, Texas (2009)
DOCUMENT Full-Text Uploaded by: Chelsea Walter

This Existing Conditions Assessment (ECA) project was contracted by the U.S. Army Corps of Engineers (USACE), Fort Worth District, under Contract W9126G-06-D-0400, Task Order 008, in support of Fort Sam Houston (FSH) and Camp Bullis (CB). This ECA report was prepared to support the Army Alternate Procedures (AAP) Historic Properties Component (HPC) of the Integrated Cultural Resources Management Plan for historic buildings and Army Regulations for building reduction. The HPC has standard...


Phase I Existing Conditions Assessment of Building 2018, Fort Sam Houston, Texas (2009)
DOCUMENT Full-Text Uploaded by: Chelsea Walter

This Existing Conditions Assessment (ECA) project was contracted by the U.S. Army Corps of Engineers (USACE), Fort Worth District, under Contract W9126G-06-D-0400, Task Order 008, in support of Fort Sam Houston (FSH) and Camp Bullis (CB). This ECA report was prepared to support the Army Alternate Procedures (AAP) Historic Properties Component (HPC) of the Integrated Cultural Resources Management Plan for historic buildings and Army Regulations for building reduction. The HPC has standard...


Phase I Existing Conditions Assessment of Building 2019, Fort Sam Houston, Texas (2009)
DOCUMENT Full-Text Uploaded by: Chelsea Walter

This Existing Conditions Assessment (ECA) project was contracted by the U.S. Army Corps of Engineers (USACE), Fort Worth District, under Contract W9126G-06-D-0400, Task Order 008, in support of Fort Sam Houston (FSH) and Camp Bullis (CB). This ECA report was prepared to support the Army Alternate Procedures (AAP) Historic Properties Component (HPC) of the Integrated Cultural Resources Management Plan for historic buildings and Army Regulations for building reduction. The HPC has standard...


Phase I Existing Conditions Assessment of Building 2157, Fort Sam Houston, Texas (2009)
DOCUMENT Full-Text Uploaded by: Chelsea Walter

This Existing Conditions Assessment (ECA) project was contracted by the U.S. Army Corps of Engineers (USACE), Fort Worth District, under Contract W9126G-06-D-0400, Task Order 008, in support of Fort Sam Houston (FSH) and Camp Bullis (CB). This ECA report was prepared to support the Army Alternate Procedures (AAP) Historic Properties Component (HPC) of the Integrated Cultural Resources Management Plan for historic buildings and Army Regulations for building reduction. The HPC has standard...


Phase I Existing Conditions Assessment of Building 238, Fort Sam Houston, Texas (2009)
DOCUMENT Full-Text Uploaded by: Chelsea Walter

This Existing Conditions Assessment (ECA) project was contracted by the U.S. Army Corps of Engineers (USACE), Fort Worth District, under Contract W9126G-06-D-0400, Task Order 008, in support of Fort Sam Houston (FSH) and Camp Bullis (CB). This ECA report was prepared to support the Army Alternate Procedures (AAP) Historic Properties Component (HPC) of the Integrated Cultural Resources Management Plan for historic buildings and Army Regulations for building reduction. The HPC has standard...


Phase I Existing Conditions Assessment of Building 240, Fort Sam Houston, Texas (2009)
DOCUMENT Full-Text Uploaded by: Chelsea Walter

This Existing Conditions Assessment (ECA) project was contracted by the U.S. Army Corps of Engineers (USACE), Fort Worth District, under Contract W9126G-06-D-0400, Task Order 008, in support of Fort Sam Houston (FSH) and Camp Bullis (CB). This ECA report was prepared to support Army Alternate Procedures (AAP) Historic Properties Component (HPC) of the Integrated Cultural Resources Management Plan for historic buildings and Army Regulations for building reduction. The HPC has standard operating...


Phase I Existing Conditions Assessment of Building 325, Fort Sam Houston, Texas (2009)
DOCUMENT Full-Text Uploaded by: Chelsea Walter

This Existing Conditions Assessment (ECA) project was contracted by the U.S. Army Corps of Engineers (USACE), Fort Worth District, under Contract W9126G-06-D-0400, Task Order 008, in support of Fort Sam Houston (FSH) and Camp Bullis (CB). This ECA report was prepared to support the Army Alternate Procedures (AAP) Historic Properties Component (HPC) of the Integrated Cultural Resources Management Plan for historic buildings and Army Regulations for building reduction. The HPC has standard...


Phase I Existing Conditions Assessment of Building 4190, Fort Sam Houston, Texas (2009)
DOCUMENT Full-Text Uploaded by: Chelsea Walter

This Existing Conditions Assessment (ECA) project was contracted by the U.S. Army Corps of Engineers (USACE), Fort Worth District, under Contract W9126G-06-D-0400, Task Order 008, in support of Fort Sam Houston (FSH) and Camp Bullis (CB). This ECA report was prepared to support the Army Alternate Procedures (AAP) Historic Properties Component (HPC) of the Integrated Cultural Resources Management Plan for historic buildings and Army Regulations for building reduction. The HPC has standard...


Phase II Existing Conditions Assessment of Building 189, Fort Sam Houston, Texas (2010)
DOCUMENT Full-Text Uploaded by: Chelsea Walter

This Existing Conditions Assessment (ECA) project was contracted by the U.S. Army Corps of Engineers (USACE), Fort Worth District, under Contract W9126G-06-D-0400, Delivery Order 013, in support of Fort Sam Houston (FSH) and Camp Bullis (CB). The Phase I and Phase II ECA reports have been prepared to conform to the Army Alternate Procedures (AAP) Historic Properties Component (HPC) of the Integrated Cultural Resources Management Plan (ICRMP) for historic buildings and Army Regulations for...


Phase II Existing Conditions Assessment of Building 198, Fort Sam Houston, Texas (2010)
DOCUMENT Full-Text Uploaded by: Chelsea Walter

This Existing Conditions Assessment (ECA) project was contracted by the U.S. Army Corps of Engineers (USACE), Fort Worth District, under Contract W9126G-06-D-0400, Delivery Order 013, in support of Fort Sam Houston (FSH) and Camp Bullis (CB). The Phase I and Phase II ECA reports have been prepared to conform to the Army Alternate Procedures (AAP) Historic Properties Component (HPC) of the Integrated Cultural Resources Management Plan (ICRMP) for historic buildings and Army Regulations for...


Phase II Existing Conditions Assessment of Building 199, Fort Sam Houston, Texas (2010)
DOCUMENT Full-Text Uploaded by: Chelsea Walter

This Existing Conditions Assessment (ECA) project was contracted by the U.S. Army Corps of Engineers (USACE), Fort Worth District, under Contract W9126G-06-D-0400, Delivery Order 013, in support of Fort Sam Houston (FSH) and Camp Bullis (CB). The Phase I and Phase II ECA reports have been prepared to conform to the Army Alternate Procedures (AAP) Historic Properties Component (HPC) of the Integrated Cultural Resources Management Plan (ICRMP) for historic buildings and Army Regulations for...


Phase II Existing Conditions Assessment of Building 2018, Fort Sam Houston, Texas (2010)
DOCUMENT Full-Text Uploaded by: Chelsea Walter

This Existing Conditions Assessment (ECA) project was contracted by the U.S. Army Corps of Engineers (USACE), Fort Worth District, under Contract W9126G-06-D-0400, Delivery Order 013, in support of Fort Sam Houston (FSH) and Camp Bullis (CB). The Phase I and Phase II ECA reports have been prepared to conform to the Army Alternate Procedures (AAP) Historic Properties Component (HPC) of the Integrated Cultural Resources Management Plan (ICRMP) for historic buildings and Army Regulations for...


Phase II Existing Conditions Assessment of Building 2019, Fort Sam Houston, Texas (2010)
DOCUMENT Full-Text Uploaded by: Chelsea Walter

This Existing Conditions Assessment (ECA) project was contracted by the U.S. Army Corps of Engineers (USACE), Fort Worth District, under Contract W9126G-06-D-0400, Delivery Order 013, in support of Fort Sam Houston (FSH) and Camp Bullis (CB). The Phase I and Phase II ECA reports have been prepared to conform to the Army Alternate Procedures (AAP) Historic Properties Component (HPC) of the Integrated Cultural Resources Management Plan (ICRMP) for historic buildings and Army Regulations for...


Phase II Existing Conditions Assessment of Building 2157, Fort Sam Houston, Texas (2010)
DOCUMENT Full-Text Uploaded by: Chelsea Walter

This Existing Conditions Assessment (ECA) project was contracted by the U.S. Army Corps of Engineers (USACE), Fort Worth District, under Contract W9126G-06-D-0400, Delivery Order 013, in support of Fort Sam Houston (FSH) and Camp Bullis (CB). The Phase I and Phase II ECA reports have been prepared to conform to the Army Alternate Procedures (AAP) Historic Properties Component (HPC) of the Integrated Cultural Resources Management Plan (ICRMP) for historic buildings and Army Regulations for...